ML15050A192

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review: North Anna Power Station Units 1 and 2, Revise Technical Specifications (TS)-Alternate to Control Rod Position Indication
ML15050A192
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/18/2015
From: V Sreenivas
Plant Licensing Branch II
To: Heacock D
Dominion Generation
References
Download: ML15050A192 (2)


Text

NRR-PMDAPEm Resource From: Sreenivas, V Sent: Wednesday, February 18, 2015 3:59 PM To: david.heacock@dom.com Cc: Tom Shaub; 'Gary D Miller'; Pascarelli, Robert; Jackson, Christopher; Palmrose, Donald; Kolcum, Gregory

Subject:

Acceptance Review: North Anna Power Station Units 1 and 2, Revise Technical Specifications (TS)-Alternate to Control Rod Position Indication By letter dated February 4, 2015, Virginia Electric and Power Company (Licensee) submitted a license amendment request (LAR) to revise North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed license amendment requests the changes to the Technical Specification (TS) TS 3.1.7, Rod Position Indication, to provide an additional monitoring option for an inoperable control rod position indicator. Specifically, the proposed changes would allow monitoring of control rod drive mechanism stationary gripper coil voltage every eight hours as an alternative to using the movable in core detectors every eight hours to verify control rod position. The purpose of this email is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at 301-415-2597.

V. Sreenivas, PH.D., C.P.M.,

North Anna Power Station Project Manager, LPL2-1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 1878 Mail Envelope Properties (V.Sreenivas@nrc.gov20150218155800)

Subject:

Acceptance Review: North Anna Power Station Units 1 and 2, Revise Technical Specifications (TS)-Alternate to Control Rod Position Indication Sent Date: 2/18/2015 3:58:47 PM Received Date: 2/18/2015 3:58:00 PM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov Recipients:

"Tom Shaub" <tom.shaub@dom.com>

Tracking Status: None

"'Gary D Miller'" <gary.d.miller@dom.com>

Tracking Status: None "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>

Tracking Status: None "Palmrose, Donald" <Donald.Palmrose@nrc.gov>

Tracking Status: None "Kolcum, Gregory" <Gregory.Kolcum@nrc.gov>

Tracking Status: None "david.heacock@dom.com" <david.heacock@dom.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2221 2/18/2015 3:58:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: