UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
January 28, 2015
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS,
LASALLE COUNTY STATION, UNITS 1 AND 2
Dear Mr. Hanson:
We have received your corporate letter RS-14-164, dated May 29, 2014, in response to
U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05,
Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested
an initial operator licensing examinations be scheduled for October 2016, and October 2018, at
the LaSalle County Station. These dates have changed from our NRC Response letter dated
January 27, 2014.
In response, we have previously scheduled initial operator licensing examinations for the weeks
of:
October 17 and 24, 2016, with an on-site validation date the week of
September 19, 2016.
October 22 and 29, 2018, with an on-site validation date the week of October 1, 2018.
In the unlikely event that we are unable to support the examination during the scheduled weeks,
we will inform you immediately, upon discovery, of such conditions and make arrangements to
administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations, unless we determine it is
necessary for the NRC to develop an examination in which case, we will notify you immediately.
The examinations have been individually scheduled for two weeks because your letter indicated
that there were more than nine applicants being considered for each of these examinations.
Please inform us if the number of candidates change for any examination as this will impact the
examination schedule. Also, please inform us at your earliest opportunity if you discover you
need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to
the examination informing the training manager of the chief examiners name. The letter will
also outline examination security expectations, list the materials required by the NRC to conduct
the examination, reconfirm the examination date, and reconfirm the number of candidates you
have in the Training Program.
B. Hanson
-2-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-373; 50-374
cc: Distribution via LISTSERV
B. Hanson
-2-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-373; 50-374
cc: Distribution via LISTSERV
DISTRIBUTION:
Kimyata MorganButler
RidsNrrDorlLpl3-2 Resource
RidsNrrPMLaSalle
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Scott Sloan
ADAMS Accession Number ML15030A147
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
RKWalton:jw
HPeterson
DATE
01/23/15
01/28/15
OFFICIAL RECORD COPY