Scheduling of Initial OL Exam
ML15030A088
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/28/2015
From: Hironori Peterson
Operations Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
RIS-14-005, RS-14-164
Download: ML15030A088 (3)


See also: RIS 2014-05

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

January 28, 2015

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS,

CLINTON STATION, UNIT 1

Dear Mr. Hanson:

We have received your corporate letter RS-14-164, dated May 29, 2014, in response to

U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05, Preparation

and Scheduling of Operator Licensing Examinations. In the letter, you requested an initial

operator licensing examinations be scheduled for October 2016, and October 2018, at the

Clinton Station. These dates have changed from your previous submittal in corporate letter

RS-13-183 and our NRC response letter dated January 27, 2014.

In response, we have scheduled initial operator licensing examinations for the weeks of:

  • November 28 and December 5, 2016, with an on-site validation date the week of

October 31, 2016.

  • October 29 and November 5, 2018, with an on-site validation date the week of

October 1, 2018.

In the unlikely event that we are unable to support the examination during the scheduled weeks,

we will inform you immediately, upon discovery, of such conditions and make arrangements to

administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations, unless we determine it is

necessary for the NRC to develop an examination in which case, we will notify you immediately.

The examinations have been individually scheduled for two weeks because your letter indicated

that there were more than nine applicants being considered for each of these examinations.

Please inform us if the number of candidates change for any examination as this will impact the

examination schedule. Also, please inform us at your earliest opportunity if you discover you

need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to

the examination informing the training manager of the chief examiners name. The letter will

also outline examination security expectations, list the materials required by the NRC to conduct

the examination, reconfirm the examination date, and reconfirm the number of candidates you

have in the Training Program.

B. Hanson -2-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-461

License No. NPF-62

cc: Distribution via LISTSERV

B. Hanson -2-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-461

License No. NPF-62

cc: Distribution via LISTSERV

DISTRIBUTION:

Kimyata MorganButler

RidsNrrDorlLpl3-2 Resource

RidsNrrPMClinton Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Eric Duncan

Allan Barker

Carole Ariano

Linda Linn

DRSIII

DRPIII

Jim Clay

Carmen Olteanu

Scott Sloan

ADAMS Accession Number ML15030A088

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME RKWalton:jw HPeterson

DATE 01/23/15 01/28/15

OFFICIAL RECORD COPY