MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 20, 2015 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNIT 2- REVIEVV OF THE FALL 2013 STEAM GENERATOR TUBE INSPECTION REPORT PERFORMED DURING REFUELING OUTAGE 2RE16 (TAC NO. MF4193)
Dear Mr. Koehl:
By letter dated May 22, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14161A146), as supplemented by letters dated November 20 and November 24, 2014 (ADAMS Accession Nos. ML14337A043 and ML14352A230, respectively),
STP Nuclear Operating Company (the licensee), submitted information summarizing the results of the 2013 steam generator inspections performed at the South Texas Project (STP), Unit 2, during refueling outage 2RE 16.
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the submittal and concludes that the licensee provided the information required by the STP, Unit 2, technical specifications. No additional follow-up is required at this time. The results of the NRC staff's review and observations are enclosed.
If you have any questions, please contact me at (301) 415-1906 or via e-mail at Lisa.Regner@nrc.gov.
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499
Enclosure:
As stated cc w/encl: Distribution via Listserv
SOUTH TEXAS PROJECT, UNIT 2 DOCKET NO. 50-499 By letter dated May 22, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14161A146), as supplemented by letters dated November 20 and November 24, 2014 (ADAMS Accession Nos. ML14337A043 and ML14352A230, respectively),
STP Nuclear Operating Company (the licensee), submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at the South Texas Project (STP),
Unit 2, during refueling outage 2RE16.
In December 2002, STP, Unit 2 replaced its SGs with four Westinghouse model Delta 94 SGs.
Each SG contains 7,585 thermally treated Alloy 690 tubes. The tubes have a nominal outside diameter of 0.688 inches, a nominal wall thickness of 0.040 inches, and are supported by stainless steel tube support plates (TSPs) with trefoil-shaped holes. The U-bends of the tubes in rows 1 through 17 were thermally stress relieved after bending.
The licensee provided the scope, extent, methods, and results of its SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings.
After review of the information provided by the licensee, the U.S. Nuclear Regulatory Commission (NRC) staff has the following comments/observations:
- The replacement SGs have operated for 112.19 effective full power months since the first inservice inspection. The next SG tube inspections are expected to take place during refueling outage (RFO) 19 in the spring of 2018.
- Loose parts tend to deposit in SG 2D because the feedwater piping for SG 2D is the last outlet on the common header. About 50 percent of the loose parts typically deposit into SG 2D, while the remaining 50 percent deposit in the other three SGs.
- Proximity signals have been present since the first inservice inspection conducted during RFO 10. No degradation has been associated with proximity indications. The licensee plans to inspect proximity indications via rotating pancake coil probe.
- Dings occurred in the tubing near the periphery of the ninth TSP as a result of fabrication (uneven heating during welding). A small number of new dings are reported each inspection outage, but the licensee does not believe that new dings are developing. Instead, the licensee believes that dings just below the reporting threshold (2 Volts) in previous outages begin to measure just above the Enclosure
threshold in following outages due to measurement uncertainty variations of indicated size from inspection to inspection.
No additional tubes were plugged in SGs 2A, 28, 2C, and 20 during RFO 2RE 16.
Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by its technical specifications. The SG tube inspections at STP, Unit 2 appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
January 20, 2015 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNIT 2- REVIEVV OF THE FALL 2013 STEAM GENERATOR TUBE INSPECTION REPORT PERFORMED DURING REFUELING OUTAGE 2RE16 (TAC NO. MF4193)
Dear Mr. Koehl:
By letter dated May 22, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14161A146), as supplemented by letters dated November 20 and November 24, 2014 (ADAMS Accession Nos. ML14337A043 and ML14352A230, respectively),
STP Nuclear Operating Company (the licensee), submitted information summarizing the results of the 2013 steam generator inspections performed at the South Texas Project (STP), Unit 2, during refueling outage 2RE 16.
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the submittal and concludes that the licensee provided the information required by the STP, Unit 2, technical specifications. No additional follow-up is required at this time. The results of the NRC staffs review and observations are enclosed.
If you have any questions, please contact me at (301) 415-1906 or via e-mail at Lisa.Regner@nrc.gov.
Sincerely, IRA/
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDoriDpr Resource RidsRgn4MaiiCenter Resource LPL4-1 Reading RidsNrrDoriLpl4-1 Resource AJohnson, NRR/DE/ESGB RidsAcrsAcnw_MaiiCTR Resource RidsNrrLAJBurkhardt Resource KKarwoski, NRR/DE/ESGB RidsNrrDeEsgb Resource RidsNrrPMSouthTexas Resource AHuynh, NRR/DE/ESGB ADAMS A ccess1on No. ML15013A101 t d J anuary 7 , 2015
- M emo d ae OFFICE NRR/DORLILPL4-1 /PM NRR/DORLILPL4-1/PM NRR/DORL/LPL4-1/LA NAME BSingal LRegner JBurkhardt DATE 1/15/15 1/20/15 1/14/15 OFFICE NRR/DE/ESGB/BC* NRR/DORLILPL4-1/BC(A) NRR/DORL/LPL4-1/PM NAME GKulesa* EOesterle LRegner DATE 1/7/15 1/20/15 1/20/15 OFFICIAL AGENCY RECORD