Response to Request for Additional Information Re Steam Generator (SG) Tube Inspection Report
ML14352A229
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 11/20/2014
From: Berg M
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G25, NOC-AE-14003199, STI: 33992531, TAC MF4193
Download: ML14352A229 (1)


Text

Nuclear Operating Company South Texas Pro/ect Electric Generatiig Station PO. Box 289 Wadsworth. Teras 77483 x*

November 20, 2014 NOC-AE-14003199 10 CFR 50.55a File No. G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 2 Docket No STN 50-499 Response to Request for Additional Information -

South Texas Project (STP), Unit 2 Steam Generator (SG) Tube Inspection Report (TAC MF4193)

References:

1. Letter; M. Berg to NRC Document Control Desk; "2RE16 Inspection Summary Report for Steam Generator Tubing;" NOC-AE-14003139; dated May 22, 2014 (ML14161A146)
2. E-mail; B. Singal to L. Sterling; "Request for Additional Information (RAI) - South Texas Project (STP), Unit 2 Steam Generator (SG) Tube Inspection Report (TAC MF4193);"

AE-NOC-1 4002583;dated October 29, 2014 (ML14302A821)

By Reference 1, the STP Nuclear Operating Company (STPNOC) submitted the results of the South Texas Project Unit 2 steam generator tube inspection performed during refueling outage 2RE16. By Reference 2, the NRC staff requested additional information to complete its review.

STPNOC's response to Reference 2 is provided in the attachment to this letter.

There are no commitments in this letter.

If there are any questions, please contact Drew Richards at (361) 972-7666 or me at (361) 972-7030.

Michael Berg Manager, Design Engineering Testing & Programs Engineering MJB/amr

Attachment:

Response to Request for Additional Information - STP Unit 2 Steam Generator Tube Inspection Report A00(!

STI: 33992531