ML15012A063

From kanterella
Jump to navigation Jump to search
Quality Assurance Program Manual - Corrected Page
ML15012A063
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
(DPR-028)
Issue date: 01/08/2015
From: Harris E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2015-00001
Download: ML15012A063 (4)


Text

CNRO-2015-00001 January 08, 2015 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention:

Document Control Desk

SUBJECT:

Entergy Vermont Yankee Quality Assurance Program Manual -

Corrected Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCE:

Entergy Nuclear Operations, Inc. letter to the NRC, Submittal of the Entergy Vermont Yankee Quality Assurance Program, Manual, Revision 0, dated October 30, 2014 (ADAMS Accession No. ML14308A078)

Dear Sir or Madam:

In the referenced letter, Entergy Nuclear Operations, Inc. (Entergy) submitted Revision 0 of the Entergy Vermont Yankee Nuclear Power Station Quality Assurance Program Manual to the NRC. The effective date denoted on the cover page of the document is October 27, 2014. This date was made in error; the correct effective date of record is October 31, 2014.

A corrected cover page is attached.

This letter contains no new commitments.

Should you have any questions, please contact Ms. Alisha Johnson-Thomas at (601) 368-5352.

Sincerely, EDH/ajt

Attachment:

Entergy Vermont Yankee Nuclear Power Station Quality Assurance Program Manual, Revision 0, Cover Page Entergy Nuclear Operations, Inc.

P. O. Box 31995 Jackson, Mississippi 39286-1995 Edward D. Harris Manager, Quality Assurance (601) 368-5649 eharri2@entergy.com

CNRO-2015-00001 Page 2 of 2 cc:

Mr. Daniel H. Dorman Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. William M. Dean Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission OWFN - Mail Stop 13 H16 11555 Rockville Pike Rockville, MD 20852-2378 Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission OWFN - Mail Stop 08 D15 Washington, DC 20555 NRC Senior Resident Inspector Vermont Yankee Mr. Christopher Recchia, Commissioner Vermont Department of Public Service 112 State Street, Drawer 20 Montpelier, VT 05620-2601

ATTACHMENT CNRO-2015-00001 ENTERGY VERMONT YANKEE NUCLEAR POWER STATION QUALITY ASSURANCE PROGRAM MANUAL, REVISION 0, COVER PAGE

)JJIGXMZI3GXSFIV

6IZMWMSR

Vermont Yankee Nuclear Power Station (SGOIX2S

0MGIRWI2S(46

(SGOIX2S

Quality Assurance Program Manual