CNRO-2015-00001, Entergy Vermont Yankee, Submittal of Quality Assurance Program Manual - Corrected Page
| ML15084A102 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/08/2015 |
| From: | Harris E Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNRO-2015-00001 | |
| Download: ML15084A102 (4) | |
Text
Entergy Entergy Nuclear Operations, Inc.
P. 0. Box 31995 Jackson, Mississippi 39286-1995 Edward D. Harris Manager, Quality Assurance (601) 368-5649 eharri2@entergy.com CNRO-2015-00001 January 08, 2015 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention:
Document Control Desk
SUBJECT:
Entergy Vermont Yankee Quality Assurance Program Manual -
Corrected Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28
REFERENCE:
Entergy Nuclear Operations, Inc. letter to the NRC, Submittal of the Entergy Vermont Yankee Quality Assurance Program, Manual, Revision 0, dated October 30, 2014 (ADAMS Accession No. ML14308A078)
Dear Sir or Madam:
In the referenced letter, Entergy Nuclear Operations, Inc. (Entergy) submitted Revision 0 of the Entergy Vermont Yankee Nuclear Power Station Quality Assurance Program Manual to the NRC. The effective date denoted on the cover page of the document is "October 27, 2014". This date was made in error; the correct effective date of record is "October 31, 2014".
A corrected cover page is attached.
This letter contains no new commitments.
Should you have any questions, please contact Ms. Alisha Johnson-Thomas at (601) 368-5352.
Sincerely, EDH/ajt
Attachment:
Entergy Vermont Yankee Nuclear Power Station Quality Assurance Program Manual, Revision 0, Cover Page
CNRO-2015-00001 Page 2 of 2 cc:
Mr. Daniel H. Dorman Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. William M. Dean Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission OWFN-Mail Stop 13 H16 11555 Rockville Pike Rockville, MD 20852-2378 Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission OWFN - Mail Stop 08 D15 Washington, DC 20555 NRC Senior Resident Inspector Vermont Yankee Mr. Christopher Recchia, Commissioner Vermont Department of Public Service 112 State Street, Drawer 20 Montpelier, VT 05620-2601
ATTACHMENT CNRO-201 5-00001 ENTERGY VERMONT YANKEE NUCLEAR POWER STATION QUALITY ASSURANCE PROGRAM MANUAL. REVISION 0, COVER PAGE
-Entergy Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28 Docket No. 72-59 Quality Assurance Program Manual Effective: October 31, 2014 Revision 0