ML15009A218

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review Results - License Amendment Request to Revise Minimum Critical Power Ratio Safety Limit - Columbia Generating Station - TAC No. MF5327
ML15009A218
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/09/2015
From: Andrea George
Plant Licensing Branch IV
To: Linda Williams
Energy Northwest
References
TAC MF5327
Download: ML15009A218 (2)


Text

NRR-PMDAPEm Resource From: George, Andrea Sent: Friday, January 09, 2015 9:02 AM To: 'Williams, Lisa L.'

Subject:

Acceptance Review Results - License Amendment Request to Revise Minimum Critical Power Ratio Safety Limit - Columbia Generating Station - TAC No. MF5327 Ms. Williams, By letter dated October 27, 2014 (Agencywide Documents Access and Management System (ADAMS)

Package Accession No. ML14336A100), Energy Northwest (the licensee) submitted a license amendment request (LAR) for Columbia Generating Station (CGS). The proposed amendment would modify the Technical Specifications (TSs) to revise values for the safety limit minimum critical power ratio (SLMCPR) due to core loading fuel management changes, namely, the incorporation of GNF2 fuel in the upcoming operating cycle.

The GNF2 fuel design review has been previously submitted to the Nuclear Regulatory Commission (NRC) for approval and is not a part of this LAR.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Sincerely, Andrea George Project Manager Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission 301-415-1081 1

Hearing Identifier: NRR_PMDA Email Number: 1806 Mail Envelope Properties (6F9E3C9DCAB9E448AAA49B8772A448C50238E988499B)

Subject:

Acceptance Review Results - License Amendment Request to Revise Minimum Critical Power Ratio Safety Limit - Columbia Generating Station - TAC No. MF5327 Sent Date: 1/9/2015 9:02:04 AM Received Date: 1/9/2015 9:02:00 AM From: George, Andrea Created By: Andrea.George@nrc.gov Recipients:

"'Williams, Lisa L.'" <llwilliams@energy-northwest.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2703 1/9/2015 9:02:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: