ML15009A182

From kanterella
Jump to navigation Jump to search
Initial Examination 05000413/2015301, Catawba Nuclear Station, Notification of Licensed Operator
ML15009A182
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/09/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Henderson K
Duke Energy Corp
References
50-413/15-301
Download: ML15009A182 (4)


See also: IR 05000413/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

January 9, 2015

Duke Energy Corporation

ATTN: Mr. Kelvin Henderson

Site Vice President

Catawba Nuclear Station

4800 Concord Road

York, SC 29745-9636

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000413/2015301

Dear Mr. Henderson:

In a telephone conversation on January 6, 2015, between Mr. Steve Tripi, Supervisor, Nuclear

Operations Training and Mr. Gary Callaway, Senior reactor Technology Instructor,

arrangements were made for the administration of licensing examinations at Catawba Nuclear

Station. The operating test is scheduled to be administered during the week of May 18, 2015.

The written examination is scheduled to be administered the week of May 25, 2015. The on-site

preparatory week is scheduled for the week of April 20, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by February 27, 2015. Mr. Callaway provided the written examination outline to your

staff in September, 2014. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by March 27, 2015. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

K. Henderson

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

K. Henderson

3

Thank you for your cooperation in this matter. Mr. Tripi has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Callaway at (423) 855-6502, (Internet E-mail:

Gary.Callaway@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-413

License Nos.: NPF-35

cc: Distribution via Listserv

__ML15009A182______________ x

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

NRC:TTC

SIGNATURE

EFG

GWC VIA EMAIL

NAME

GUTHRIE

CALLAWAY

DATE

1/ 9 /2015

1/7/2015

E-MAIL COPY?

YES

NO YES

NO

YES

N

YES

NO YES

NO YES

NO YES

NO