MONTHYEARIR 05000244/20244012024-11-20020 November 2024 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2024401 IR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 IR 05000244/20240032024-11-0808 November 2024 Integrated Inspection Report 05000244/2024003 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 IR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 ML24234A0922024-08-21021 August 2024 Requalification Program Inspection NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 2024-09-06
[Table view] |
Text
AdINEW AdWMMW ANNOw Exeton.
This letter contains proprietary information requested to be withheld from public disclosure under 10 CFR 2.390. The letter is non-proprietary upon removal of Attachment 1.
January 07, 2015 Confidential Information Submitted Under 10 CFR 2.390 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-410 R. E. Ginna Nuclear Power Plant, Unit 1 Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244
Subject:
Submittal of Annual Report of the Nuclear Advisory Committee
References:
Letter from D.V. Pickett (NRC) to C.M. Crane (Exelon), "Orders Approving Corporate Merger Between Exelon Corporation and Constellation Energy Group, Inc., and Resultant Indirect Transfer of Renewed Facility Operating Licenses -
Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, and Independent Spent Fuel Storage Installation, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant (TAC Nos. ME6234, ME6235, ME6236, ME6237, and ME 6238)," (ML113560381) dated February 15, 2012.
The purpose of this letter is to provide the annual report of the Constellation Energy Nuclear Group, LLC (CENG) Nuclear Advisory Committee, as required by the above Reference. This Reference requires that the report be submitted within 30 days of the report completion or January 31, whichever comes first. The report was distributed to the CENG board of directors and declared final on December 8, 2014.
Attachment 1 is a proprietary version of the annual report of the Nuclear Advisory Committee to the CENG Board of Directors. Attachment 1 contains information confidential to Exelon Generation Company, LLC. Exelon Generation Company, LLC requests that the contents of Attachment 1 be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4).
Proprietary/Confidential information requested to be withheld from public disclosure under 10 CFR 2.390.
Proprietary/Confidential information requested to be withheld from public disclosure under 10 CFR 2.390.
Submittal of Annual Report of the Nuclear Advisory Committee Page 2 A non-proprietary version of the annual report is contained in Attachment 2. An affidavit supporting the 2.390(a)(4) request is contained in Attachment 3.
This correspondence does not contain any regulatory commitments.
Should you have any questions concerning this letter, please contact Laura Cates, at (610) 765-5729.
I declare under penalty of perjury that the foregoing is true and correct. This statement was executed on the 7th Day of January, 2015.
pResctf ully, adley Few PI Vice President & Deputy General Counsel Exelon Generation Company, LLC Attachments: 1. 2014 Report of the Nuclear Advisory Committee to the CENG Board of Directors (Proprietary)
- 2. 2014 Report of the Nuclear Advisory Committee to the CENG Board of Directors (Non-Proprietary)
- 3. 10 CFR 2.390 Affidavit of J. Bradley Fewell cc: With Attachment 1 NRC Project Manager, Calvert Cliffs NRC Project Manager, Nine Mile Point NRC Project Manager, R.E. Ginna NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs NRC Resident Inspector, Nine Mile Point NRC Resident Inspector, R.E. Ginna Without Attachment 1 S. Gray, Maryland DNR Proprietary/Confidential information requested to be withheld from public disclosure under 10 CFR 2.390.
Attachment 3 10 CFR 2.390 Affidavit of J. Bradley Fewell
ATTACHMENT 3 10 CFR 2.390 AFFIDAVIT OF J. BRADLEY FEWELL UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Exelon Generation Company, LLC )
AFFIDAVIT I, J. Bradley Fewell, Vice President and Deputy General Counsel of Exelon Generation, LLC (Exelon), do hereby affirm and state:
- 1. I am authorized to execute this affidavit on behalf of Exelon and its affiliates.
- 2. Exelon is providing information in support of the Order approving the corporate merger between Exelon and Constellation Energy Group, Inc., and the resultant indirect transfer of the Renewed Facility Operating Licenses, approved February 15, 2012 (ML113560381). The document being provided in Attachment 1 contains confidential and proprietary information related to a report generated by the Nuclear Advisory Committee (NAC) for the Constellation Energy Nuclear Group, LLC (CENG) board of directors, information on proprietary decommissioning cost estimates, and confidential information provided to the Committee on Foreign Investment in the United States. This information constitutes proprietary information that should be held in confidence by the NRC pursuant to the policy reflected in 10 CFR 2.390(a)(4) and 9.17(a)(4), because:
- i. This information is and had been held in confidence by Exelon.
ii. This information is of a type that is customarily held in confidence by CENG, and there is a rational basis for doing so because the information contains sensitive business information. In particular, the NAC report discusses proprietary internal discussions and activities by and between Exelon and CENG management and the NAC, as well as legal and regulatory analysis prepared by internal and external legal counsel for the benefit of CENG and the NAC.
iii. This information is being transmitted to the NRC voluntarily and in confidence.
iv. This information is not available in public sources and could not be gathered readily from other publicly available information.
- v. Public disclosure of this information would create substantial harm to the competitive position of Exelon and CENG by disclosing confidential commercial information, including internal business discussions and activities as well as the legal and regulatory advice prepared by counsel at the request and for the benefit of CENG management or the NAC that is intended solely for internal use.
ATTACHMENT 3 10 CFR 2.390 AFFIDAVIT OF J. BRADLEY FEWELL
- 3. Accordingly, we request that Attachment 1 be withheld from public disclosure pursuant to the policy reflected in 10 CFR 2.390(a)(4) and 9.17(a)(4).
Subscribed and sworn before me, a Notary Public, in and for the Commonwealth of Pennsylvania, this "/t' day of . , .15 "y*uAr.- 1 WITNESS my hand and Notarial Seal:
Notary Public My Commission Expires: to-7,D0 DatE COMMONWEALTH OF PENNSYLVANIA Notarial Seal Karen A. Williams, Notary Public Kennett Twp., Chester County My Commission Expires May 14, 2016 MEMBER, PENNSYLVANIA ASSOCIATION OF NOTARIES