Forwards IE Insp Repts 50-259/79-32,50-260/79-32 & 50-296/79-32 on 791016-18.No Noncompliance Noted
ML14358A387
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/09/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML14358A388 List:
References
NUDOCS 7912210203
Download: ML14358A387 (2)


See also: IR 05000259/1979032

Text

o4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

NOV - 9 1979

In Reply Refer To:

RII:PKV

50-259/79-32

50-260/79-32

50-296/79-32

Tennessee Valley Authority

ATTN: H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by P. K. VanDoorn of this office on

October 16-18, 1979,

of activities authorized by NRC Operating License Nos.

DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility, and to the discussion

of our findings held with H. L. Abercrombie at the conclusion of the inspection.

SAreas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it

is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary,

and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

SII

Tennessee Valley Authority

-2-

NOV - 91979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosures:

Inspection Report Nos. 50-259/79-32,

50-260/79-32, and 50-296/79-32

cc w/encl:

H. L. Abercrombie

Plant Superintendent

P. 0. Box 2000

Decatur, AL 35602

D. E. McCloud, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902