MONTHYEARML14325A6442014-11-14014 November 2014 Response to Request for Additional Information Regarding License Amendment Request for Proposed Technical Specification Changes of the Refueling Water Storage Tank Allowable Temperatures Project stage: Response to RAI ML14350B3672014-12-15015 December 2014 NRR E-mail Capture - Request for Additional INFORMATION-LAR for Millstonr Unit 3, RWST Allowable Temperature Change (MF3078) Project stage: RAI ML14350B3662014-12-15015 December 2014 Request for Additional INFORMATION-MILLSTONE 2 Aging Management Program for License Renewal Commitment Number 13 Project stage: RAI ML15044A0442015-02-0909 February 2015 Revised Response to Request for Additional Information Regarding License Amendment Request for Proposed Technical Specification Changes of the Refueling Water Storage Tank Allowable Temperatures Project stage: Response to RAI ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures Project stage: Approval 2014-12-15
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] |
Text
NRR-PMDAPEm Resource From: Thadani, Mohan Sent: Monday, December 15, 2014 12:04 PM To: Wanda D Craft (Generation - 6) (wanda.d.craft@dom.com); William D Bartron (Generation -
- 4) (william.d.bartron@dom.com)
Cc: Sallman, Ahsan
Subject:
RE: REQUEST FOR ADDITIONAL INFORMATION-LAR FOR MILLSTONR UNIT 3, RWST ALLOWABLE TEMPERATURE CHANGE (MF3078)
Wanda and Bill:
By letter dated November 14,, 2014, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14325A644), Dominion Nuclear Connecticut, Inc., (the Licensee) submitted a response to the NRC request for additional information, related to License Amendment Request (LAR) for Millstone Power Station Unit 3. The proposed LAR would revise the Technical Specification (TS) 3/4.5.4, Refueling Water Storage TANK, and TS 3/4.6.2.1, Depressurization and Cooling Systems, Containment Quench Spray System, to provide additional operational margin for control of the Refueling Water Storage Tank temperature.
The NRC staff has reviewed the licensees response to the NRCs request for additional information, and has a need for additional information regarding response to the NRC staffs question (2) which relates to Westinghouse NSAL-14-2. The NRC staffs request for additional information is attached below.
Please provide your responses within 30 days from the date of this email to facilitate timely completion of the NRC staffs review of the licensees request.
- Regards, Mohan C Thadani Senior Project Manager Millstone, Ginna, and Exelon Northeast Fleet Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST FOR REFUELING WATER STORAGE TANK TEMPERATURE TECHNICAL SPECIFICATION CHANGE DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT 3 DOCKET NUMBER 50-423 1
By letter dated November 14,, 2014, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14325a644), Dominion Nuclear Connecticut, Inc., (the Licensee) submitted a License Amendment Request (LAR) for Millstone Power Station Unit 3. The proposed LAR would revise the Technical Specification (TS) 3/4.5.4, Refueling Water Storage TANK, and TS 3/4.6.2.1, Depressurization and Cooling Systems, Containment Quench Spray System, to provide additional operational margin for control of the Refueling Water Storage Tank temperature.
In the letter dated November 14, 2014, the licensees response to staff Question 2 regarding Westinghouse NSAL-14-2 states:
The current FSAR analyses have not been updated to address NSAL-14-2, "Westinghouse Loss-of-Coolant Accident Mass and Energy Release Calculation Issue for Steam Generator Tube Material Properties," which was distributed to MPS3 on April 8, 2014. NSAL-14-2 was applicable to MPS3, in that the analysis of record used material properties for stainless steel instead of Alloy 600, leading to an under prediction of the initial stored energy in the steam generator tubes. Based on preliminary information, MPS3 expects no impact on the short-term containment peak pressure calculation and a very small effect on the long-term energy release that can be accommodated by margins available in the containment analyses. DNC expects no impact from NSAL 14-2 on the RWST temperature limits proposed in the LAR submitted November 6, 2013. MPS3 is addressing NSAL-14-2 through the corrective action process.
In the above statement It is noted that the DNC has not made a final conclusion regarding the impact of M&E errors reported in NSAL-14-2. In that regard, the NRC staff requests a response to the following:
After correction of the M&E errors (reported in NSAL-14-2) and with the proposed RWST water temperature in the licensing basis analysis, provide the following: (a) revised short-term containment peak pressure, (b) long term containment analyses results, and (c) change in input parameters and assumptions which reduced the margins available in containment analyses for accommodating the increase in the long-term energy release.
2
Hearing Identifier: NRR_PMDA Email Number: 1764 Mail Envelope Properties (Mohan.Thadani@nrc.gov20141215120400)
Subject:
RE: REQUEST FOR ADDITIONAL INFORMATION-LAR FOR MILLSTONR UNIT 3, RWST ALLOWABLE TEMPERATURE CHANGE (MF3078)
Sent Date: 12/15/2014 12:04:29 PM Received Date: 12/15/2014 12:04:00 PM From: Thadani, Mohan Created By: Mohan.Thadani@nrc.gov Recipients:
"Sallman, Ahsan" <Ahsan.Sallman@nrc.gov>
Tracking Status: None "Wanda D Craft (Generation - 6) (wanda.d.craft@dom.com)" <wanda.d.craft@dom.com>
Tracking Status: None "William D Bartron (Generation - 4) (william.d.bartron@dom.com)" <william.d.bartron@dom.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3992 12/15/2014 12:04:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: