Review of the Core Operating Limits Report (Colr), Cycle 19
ML14329B115
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/11/2014
From: Carleen Parker
Plant Licensing Branch 1
To: Joyce T
Public Service Enterprise Group
Carleen Parker, NRR/DORL 415-1603
References
TAC MF3064
Download: ML14329B115 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 11, 2014 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear P.O. Box 236, N09 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION- REVIEW OF THE CORE OPERATING LIMITS REPORT, RELOAD 18, CYCLE 19, REVISION 9 (TAC NO. MF3064)

Dear Mr. Joyce:

By letter dated November 4, 2013, as supplemented by letter dated October 22, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.

ML13308C238 and ML14295A412, respectively), PSEG Nuclear, LLC submitted the Hope Creek Generating Station, Reload 18, Cycle 19, Revision 9, Core Operating Limits Report (COLR) in accordance with Technical Specification (TS) Section 6.9.1.9.

The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the report and concluded that the cycle-specific parameter limits were developed using NRC approved methodologies and that changes between the previous COLR and the COLR for Reload 18, Cycle 19, Revision 9, are conservative in nature and pose no safety concern. The NRC staff has determined that PSEG Nuclear, LLC has met the TS requirements.

If you have any questions, please contact me at (301) 415-1603 or via e-mail at Carleen. Sanders-Parker@nrc.gov.

s(Ir k Y~-~

Carleen J. Pa /\ , Project Manager Plant LicensinUranch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Distribution via ListServ

December 11, 2014 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear P.O. Box 236, N09 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION- REVIEW OF THE CORE OPERATING LIMITS REPORT, RELOAD 18, CYCLE 19, REVISION 9 (TAC NO. MF3064)

Dear Mr. Joyce:

By letter dated November 4, 2013, as supplemented by letter dated October 22, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.

ML13308C238 and ML14295A412, respectively), PSEG Nuclear, LLC submitted the Hope Creek Generating Station, Reload 18, Cycle 19, Revision 9, Core Operating Limits Report (COLR) in accordance with Technical Specification (TS) Section 6.9.1.9.

The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the report and concluded that the cycle-specific parameter limits were developed using NRC approved methodologies and that changes between the previous COLR and the COLR for Reload 18, Cycle 19, Revision 9, are conservative in nature and pose no safety concern. The NRC staff has determined that PSEG Nuclear, LLC has met the TS requirements.

If you have any questions, please contact me at (301) 415-1603 or via e-mail at Carleen. Sanders-Parker@nrc.gov.

Sincerely, IRA/

Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC LPLI-2 R/F RidsNrrDoriDpr Resource RidsNrrDorllpll-2 Resource RidsNrrDssSrxb Resource RidsNrrPMHopeCreek Resource RidsNrrLAABaxter Resource RidsRgn1 MaiiCenter Resource JWhitman, NRR ADAMS A ccess1on No.: ML143298115 *b>Y memo d a t ed OFFICE LPL 1-2/PM LPL 1-2/LA SRXB/BC LPL 1-2/BC NAME CParker A Baxter CJackson MKhanna DATE 12/1/14 12/4/14 12/8/14 12/11/14 OFFICIAL RECORD COPY