Summary of 960530 Meeting W/Cp&L in Rockville, MD to Discuss Related Activities Re UFSAR Review & Upgrade Plan for Listed Facilities
ML14314A635
Person / Time
Site: Harris, Brunswick, Robinson  
Issue date: 06/10/1996
From: Le N
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9606180448
Download: ML14314A635 (14)


Text

June 10, 1996 LICENSEE:

Carolina Power & Light Company FACILITIES:

Shearon Harris Nuclear Power Plant, Unit 1, H. B. Robinson Nuclear Power Plant, Unit 2, Brunswick Steam Electric Plant, Units 1 & 2

SUBJECT:

SUMMARY

OF THE MAY 30, 1996, MEETING WITH CAROLINA POWER &

LIGHT COMPANY A meeting was held with Carolina Power & Light Company (CP&L, the licensee) on May 30, 1996, at the NRC in Rockville, Maryland for the licensee to discuss related activities regarding their UFSAR Review and Upgrade Plan for the three CP&L facilities:

Shearon Harris Nuclear Power Plant, Unit 1, H. B. Robinson Nuclear Power Plant, Unit 2, and the Brunswick Steam Electric Plant, Units 1 and 2. is the list of meeting attendees, and details of the licensee discussion during the meeting are described in Enclosure 2.

(Original Signed By)

Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulations Docket Nos. 50-400,( 0 1 50-325, 50-324

Enclosures:

As stated cc w/enclosures:

See next page Document Name: G:\\HARRIS\\MTG96530.SUM OFC LA:PD21:DRPE PM:PD21:DRPE D:PD21:DRPE NAME EDunningto NLe Elmbro DATE 06/

6

/96 06/ 6 /96 06/ /V /96 OFFICIAL RECORD COPY 9606180448 960610 PDR ADOCK 05000261 p

PDR

0

'June 10, 1996 DISTRIBUTION w/enclosure 1 W. Russell/F. Miraglia R. Zimmerman S. Varga OGC E. Jordan ACRS (10)

G. Tracy, EDO DISTRIBUTION w/enclosures 1 & 2

<Docket Li 1e PDR & Local LPDR PD#II-1 Reading E. Merschoff, Region II B. Long, Region II cc:

Licensee & Service List (with all enclosures) 170026

Mr. W. R. Robinson Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:

Mr. William 0. Johnson Mr. J. W. Donahue Vice President and Senior Counsel Plant Manager - Harris Plant Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 Shearon Harris Nuclear Power Plant Raleigh, North Carolina 27602 Post Office Box 165, MC: Zone 1 New Hill, North Carolina 27562-0165 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Mr. Robert P. Gruber 5421 Shearon Harris Road Executive Director New Hill, North Carolina 27562-9998 Public Staff NCUC Post Office Box 29520 Ms. Karen E. Long Raleigh, North Carolina 27626 Assistant Attorney General State of North Carolina Chairman of the North Carolina Post Office Box 629 Utilities Commission Raleigh, North Carolina 27602 Post Office Box 29510 Raleigh, North Carolina 27626-0510 Public Service Commission State of South Carolina Mr. T. D. Walt Post Office Drawer 11649 Manager, Regulatory Affairs Columbia, South Carolina 29211 Carolina Power & Light Company Shearon Harris Nuclear Power Plant Regional Administrator, Region II P. 0. Box 165, Mail Zone 1 U.S. Nuclear Regulatory Commission NewHill, North Carolina 27562-0165 101 Marietta St., N.W. Suite 2900 Atlanta, Georgia 30323 Mr. Vernon Malone, Chairman Board of County Commissioners Mr. Dayne H. Brown, Director of Wake County Division of Radiation Protection P. 0. Box 550 N.C. Department of Environmental Raleigh, North Carolina 27602 Division of Radiation Protection Commerce & Natural Resources Ms. Uva Holland, Chairman Post Office Box 27687 Board of County Commissioners Raleigh, North Carolina 27611-7687 of Chatham County P. 0. Box 87 Mr. J. Cowan Pittsboro, North Carolina 27312 Manager Nuclear Services and Environmental Mr. Milton Shymlock Support Department U.S. Nuclear Regulatory Comm.

Carolina Power & Light Company 101 Marietta Street, N.W.

Post Office Box 1551 - Mail OHS7 Suite 2900 Raleigh, North Carolina 27602 Atlanta, Georgia 30323-0199

ENCLOSURE 1 LIST OF ATTENDEES NRC/CP&L Meetinq 05/30/96 Name Office Tommy Le NRC -

Project Manager Lynn Connor STS, Inc.

Brenda Mozafari NRC -

Project Manager R. M. Krich CP&L/ Robinson Plant G. D. Hicks CP&L/ Brunswick W. S. Orser CP&L/ Executive VP D. B. Alexander CP&L/ Harris Tom Walt CP&L/ Harris Eileen McKenna NRR -

PGE Branch Mike Davis NRR -

PIP Branch Dave Nelson NRR -

PIP Branch Steven Stein NRR -

PIP Branch William T. LeFave NRR - DSSA/ SPL Branch Geoffrey Golub NRR -

SRX Branch Dick Clark NRR -

Division of Projects Doug Walters NEI Dave Trimble NRR -

Project Manager Milton Shymlock NRC - RII/ DRP/ Branch Chief B-4 Eugene Imbro NRR -

PD II-1 Project Director Steve Varga NRR - DRPE/ Division Director

LCJctosukE.2 Nuclear Generation Group UFSAR Review/Upgrade Plan T. Walt, D. Hicks, R. Krich Regulatory Affairs Managers CP& L

UFSAR Review/Upgrade Plan

  • Basic Elements
  • Other Related Work and Initiatives
  • Examples of Identified Discrepancies
  • Brunswick Nuclear Plant m Harris Nuclear Plant
  • Robinson Nuclear Plant
  • Summary

Basic Elements

  • Reinforce staff's knowledge of purpose and content
  • Operation and maintenance must conform
  • Need high degree of accuracy m Assign accountability for UFSAR sections
  • Initially review to identify significant discrepancies
  • Validate selected sections of UFSAR
  • Validation
  • Evaluate and correct deficiencies
  • Condition Reporting Program
  • Assess effectiveness of review/upgrade program

Initial Review

  • Performed by knowledgeable individuals
  • System Engineers
  • E & RC
  • Nuclear Fuels
  • Operations
  • Training
  • Identify discrepancies using current knowledge
  • Plant Configuration
  • Procedures, Processes and Programs
  • Operating Parameters

Initial Review continued

  • Resolve questionable information
  • Other design and implementation documents as required
  • Field verification as required m Resolve in a timely manner
  • Develop indicators for progress reporting
  • Not a complete validation
  • Planned for completion by mid-1997 0

Other Related Work and Initiatives

  • Conversion to Improved Standard Technical Specifications
  • Nuclear Assessment Section/Performance Evaluation Support
  • Self Assessments (e.g.):
  • Inservice Inspection/Inservice Testing m Control Building Ventilation
  • Power Uprate/24 Month Fuel Cycle (BNP)

Examples of Identified Discrepancies Brunswick Nuclear Plant

  • Make Up Water Treatment Process Change
  • Meteorological Tower Instrument Annual Replacement
  • Radwaste Resin Processing System Abandonment
  • Reactor Building Overhead Crane Lifting Rig Description
  • Control Building Intake Ventilation Filters
  • Condensate Filter Element Replacement

Examples of Identified Discrepancies Harris Nuclear Plant

  • Unit 2 Spent Fuel Pool Description
  • Engineering Safety Feature Response Times
  • Large Break LOCA Analysis Changes
  • Organization Changes

Examples of Identified Discrepancies Robinson Nuclear Plant Containment Air Recirculation Filter Reactor Coolant Pump Flywheel New Fuel Storage Capacity Orifice in Air Supply Line to Personnel Air Lock Hatch Surveillance Test Equipment Reactor Auxiliary Building Floor Drain Bypassed

UFSAR Review/Upgrade Plan Summary

  • Expect routine use of UFSAR
  • Expect high degree of compliance and accuracy
  • Complete initial review
  • Evaluate and correct deficiencies
  • Validate selected sections
  • One of several initiatives to assure safe and compliant operation