ML14314A491

From kanterella
Jump to navigation Jump to search
Confirms Arrangments Made for Administration of Licensing Exams at Plant Scheduled for Wk of 940711.Requests Ref Matls Listed in Attachment 2 of ES-201 by 940425
ML14314A491
Person / Time
Site: Robinson 
Issue date: 04/12/1994
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hinnant C
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9404200017
Download: ML14314A491 (5)


Text

FORD 1 REGUL RY INFORMATION DISTRIBUT SYSTEM (RIDS)

ACCESSION NBR:9404200017 DOC.DATE: 94/04/12 NOTARIZED: NO DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION PEEBLES,T.A.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION HINNANT,C.S.

Carolina Power & Light Co.

SUBJECT:

Confirms arrangments made for administration of licensing exams at plant scheduled for wk of 940711.Requests ref-matls listed in Attachment 2 of ES-201 by 940425.

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1

MOZAFARI,B 1

INTERNAL-:=NRR-/-DRCH-/HHFBPT 1

NRR/DRCH/HOLB10 1

REG ~FILE=~

02 1

RGN2 FILE 01 1

EXTERNAL: NRC PDR 1

NSIC 1

1 I

1,,OTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL-NUMBER OF COPIES.REQUIRED: LTTR 8

ENCLL*

APR I 2 W994 Docket No. 50-261 License No. DPR-23 Carolina Power and Light Company ATTN:

Mr. C. S. Hinnant Vice President H. B. Robinson Steam Electric Plant Unit 2 P.. 0. Box 790 Hartsville, SC 29550-0790 Gentlemen:

SUBJECT:

REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS EXAMINATION REPORT NO. 50-261/94-300 The purpose of this letter is to confirm arrangements made in a telephone conversation on April 4, 1994 between Mr. Robert Townsend, Manager-Initial Training, and Mr. D. Charles Payne, License Examiner, NRC Region II Operator Licensing Section, for the administration of licensing examinations at the H. B. Robinson Steam Electric Plant. The examination preparation visit is scheduled for the week of July 11, 1994.

The written examinations are scheduled for July 25, 1994, and the operating examinations are scheduled for July 26-28, 1994.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of July 4, 1994.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials listed in Attachment 2 of ES-201 by April 25, 1994. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

9404200017 940412 PDR ADOCK 05000261 V

PDR

Carolina Power & Light Co.

2 APR12 1994 ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor operator and senior reactor operator license applications.and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (0MB) Clearance Number 3150-0101, which expires October 31, 1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing, and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB 7714, Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D. C. 20503.

From the requested reference materials identified in Attachment 2 of ES-201, we would appreciate retaining your EOPs and AOPs for reference use in our Incident Response Center. If you have any concerns about this proposed use, please contact me at (404) 331-5541.

Thank you for your cooperation in this matter. Mr. Townsend has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lawrence L. Lawyer, Chief, Operator Licensing Section, at (404) 331-4700, or myself at (404) 331-5541.

Sincerely, ORIGINAL SIGNED BY T. A. PEEBLES Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety cc:

M. P. Pearson, Plant Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550-0790 cc cont'd:

(See page 3)

Carolina Power & Light Co.

3 APR 1 2 1994 cc cont'd:

H. W. Habermeyer, Jr.

Vice President Nuclear Services Department Carolina Power & Light Company P. 0. Box 1551

- Mail OHS7 Raleigh, NC 27602 R. Krich, Manager Regulatory Compliance H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation -Protection N. C. Department of Environment, Commerce & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 H. Ray Starling Manager -

Legal Department Carolina Power and Light Co.

P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 cc cont'd:

(See page 4)

APR 0 2 19 Carolina Power & Light Co.

4 cc cont'd:

Public Service Commission State of South Carolina P. 0. Box 11649 Columbia, SC 29211 Max Herrell Manager - Training H. B. Robinson Steam Electric Generating Plant Robinson Nuclear Project Department P. 0. Box 790 Hartsville, SC 29550 bcc:

B. Mozafari, NRR A. Gibson, DRS J. Jaudon, DRS H. Christensen, DRP D. Payne, DRS W. Orders, H. B. Robinson Senior Resident Inspector G. Hallstrom, DRS Document Control Desk RH:

RI IRS RII:DRS c

ea dcp/fr LLaw rT4ees 04/

/94 04/-? /94 04//../94 DOCUMENT NAME:

G:\\LA\\ROBINSON\\I30090DA.DCP