MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 2024-09-05
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
- questions reviewed in depth.
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1
Question asks for a step buried in the subsequent actions of a 2 H 5.0 N U procedure. Replaced question.
Question asks for trivial information from the stations accident 3 F 3.0 x N U analysis. Replaced question 4 F 2.0 x N U Question requires sequence memorization. Replaced question.
5 F 2.0 M S 6 H 5.0 N U Question needs references to answer. Replaced question.
F 2.0 M U Station identified they do not have emergency-only heaters.
7 Replaced K/A, Question.
Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
- 3. Check the appropriate box if a psychometric flaw is identified:
- The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
- The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
- The answer choices are a collection of unrelated true/false statements.
- The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
- One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
- 4. Check the appropriate box if a job content error is identified:
- The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
- The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
- The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
- The question requires reverse logic or application compared to the job requirements.
- 5. Check questions that are sampled for conformance with the approved K/A, and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
- 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
- 7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Question does not ask how to interpret valve position indications.
8 2.0 N x x N U Replaced question.
9 2.0 H M S 10 2.0 H N S 11 2.0 H B E Identified answer is incorrect. Updated correct answer.
Update material to current station nomenclature. Updated 12 2.5 F B E procedure names.
13 2.0 F B S 14# 2.5 H B U Same as Question #42. Selected new K/A and question.
15 2.0 F N S 16# 2.0 F N S 17 2.0 H B S 18 2.0 F B E Update correct answer. Updated correct answer.
19# 2.0 H M S 20 2.0 H M S 21 2.0 H B S 22# 2.0 F M S 23 2.0 F B S 24 2.0 F N S Requires memorization of details that should be reviewed prior to a 25# 2.5 F x M U reactivity change. Replaced question.
Update correct answer to current procedures. Updated correct 26 2.0 H B E answer.
27 2.0 H B S 28# 2.0 F B S 29 2.0 H N E Correct the answer key. Should be (c.). Corrected answer key.
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 30 2.0 H B S Delete the time-critical aspect of the question - not necessary, not 31# 2.0 H x S E part of the K/A. Removed the time critical portion of the question and answer.
32 2.0 F N S 33 2.5 H B S 34# 2.0 H B S 35 2.0 H B S 36 2.0 F B S 37# 2.0 H N S 38 2.0 F M S 39 2.5 H N S 40# 2.0 H B S 41 2.0 H B S 42 2.0 H B S Original question #14.
43# 2.0 H B S 44 2.0 F N E Correct answer. Corrected answer 45 1.0 F x N U Question asks trivia. Replace Question Replaced question 46# 2.0 H B S 47 2.0 F x B U Q K/A. Replace Question. Replaced question 48 2.0 H B S 49# 2.5 H B S 50 2.0 F N S 51 2.0 F N S Q K/A. Doesnt address second part of the K/A. Replace Question 52# 2.5 H x B U Replaced question 53 2.0 F B S
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Ice Condenser Containment - slight differences. Re-work question.
54 2.0 F N U Reworked question 55# 2.0 F x M U Q K/A. Replace Question Replaced question 56 2.0 F N S 57 2.0 F M S 58# 2.0 H M S 59 2.5 H B S 60 2.0 H B S 61# 2.5 H B S Doesnt distinguish between competent/less-than competent 62 2.0 F x M U operator. Replace question Replaced question 63 2.0 H B S 64# 2.0 H B S 65 2.0 H N E Correct answer is (b.) - should be (a.) Corrected answer key 66 2.0 F N S 67 2.0 H B S 68 2.0 H B E Correct answer is (a.) - should be (b.) Corrected answer key 69 2.5 F N S 70 2.0 H N S 71 2.0 F N S 72 2.5 F B S 73 2.0 F M S Question requires SRO knowledge to make a transition to another 74 2.0 H B U procedure. Replace question. Replaced question.
75 2.0 F N S 76# 2.5 H x B S 77 2.0 H x N S
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 78 2.0 F x N S 79# 2.0 H x M E Remove unnecessary material from stem. Removed fluff.
80 2.5 H x M S 81 2.5 H x B S 82# 2.5 H x M S 83 2.0 H x N S Station stated this tech spec call would be determined with the 84 5.0 H x N E assistance of engineering and is beyond the normal control room technical specification calls. Replaced question.
Hydrostatic test referred to is an infrequent activity. Site engineering 85# 5.0 F x N E would participate in the application of the tech spec. Replaced question.
86 2.0 H x N S Question is RO level. This is a system question. Replaced 87 2.5 F x B U question.
Rework question to conform with Palisades language. Revised 88# 3.0 F x N E question.
89 2.5 H x N E Some minor tweaks to the wording of the stem. Made revisions.
90 2.0 H x B S 91# 2.5 H x N S Moved question to #99. Selected new K/A & Question for #91.
92 2.0 H x N S 93 2.5 H x N S 94# 2.0 F x B S 95 2.0 F x N S Fix the answer and replace bad distractor. Added requirements to 96 2.5 H x B E the answer, replaced one distractor.
97 2.0 H x B S 98 2.0 F x B S Question was replaced by Q#91 - better question for 99 2.5 H x B E determining operator ability.
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Not required from memory - direct lookup if reference is provided.
100 2.0 F x N U Replaced question