August 7, 2014, Summary of Public Meeting to Discuss the 2013 End-of-Cycle Plant Performance Assessment for Clinton Power Station
ML14231B307
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2014
From: Christine Lipa
NRC/RGN-III/DRP/B1
To:
References
Download: ML14231B307 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 19, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station

SUBJECT:

SUMMARY

OF THE AUGUST 7, 2014, NRC PUBLIC MEETING TO DISCUSS THE 2013 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT FOR CLINTON POWER STATION On August 7, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Vespasian Warner Library in Clinton, Illinois, to discuss the 2013 end-of-cycle results for Clinton Power Station for the period of January 1, 2013 through December 31, 2013. Enclosed is a list of attendees for the meeting. A copy of the NRC and licensee slides for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession Number ML14220A249 and ML14223A574 respectively.

At the meeting, the NRC provided an overview of the Reactor Oversight Program (ROP), a review of the NRCs major inspection activities for 2013, and the results of the 2013 annual assessment for Clinton. The NRCs presentation was followed by statements from the Clinton Site Vice President and the Acting Plant Manager. The licensee discussed their community outreach efforts, the review conducted by the International Atomic Energy Agency (IAEA) Operational Safety Review Team (OSART), scheduled to begin August 11, 2014, and provided an overview of the lessons learned from the evaluations to prepare for the supplemental inspection, Inspection Procedure 95001, for the White performance indicator for unplanned reactor scrams.

After the business part of the meeting ended, the NRC representatives allowed time for comments and questions from the public.

/RA/___________________________

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NFP-62

Enclosure:

Meeting Attendance List cc w/encl: Distribution via LISTSERV

CLINTON 2013 PERFORMANCE ASSESSMENT MEETING August 7, 2014 MEETING ATTENDANCE LIST NRC Attendees A. Boland, Director, Division of Reactor Projects W. Schaup, Clinton Senior Resident Inspector E. Sanchez Santiago, Clinton Resident Inspector C. Lipa, Chief, Division of Reactor Projects, Branch 1 J. Wojewoda, Reactor Engineer, Division of Reactor Projects, Branch 1 A. Barker, Regional Governmental Liaison Officer Exelon Generation Company Attendees K. Taber D. Kemper D. Koons N. Miller B. Nauman K. Otterness K. Baker C. Dunn D. Avery Illinois Emergency Management Agency S. Mischke C. Settles Members of the Public A. Field T. Barnett Enclosure

August 19, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station

SUBJECT:

SUMMARY

OF THE AUGUST 7, 2014, NRC PUBLIC MEETING TO DISCUSS THE 2013 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT FOR CLINTON POWER STATION On August 7, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Vespasian Warner Library in Clinton, Illinois, to discuss the 2013 end-of-cycle results for Clinton Power Station for the period of January 1, 2013 through December 31, 2013. Enclosed is a list of attendees for the meeting. A copy of the NRC and licensee slides for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession Number ML14220A249 and ML14223A574 respectively.

At the meeting, the NRC provided an overview of the Reactor Oversight Program (ROP), a review of the NRCs major inspection activities for 2013, and the results of the 2013 annual assessment for Clinton. The NRCs presentation was followed by statements from the Clinton Site Vice President and the Acting Plant Manager. The licensee discussed their community outreach efforts, the review conducted by the International Atomic Energy Agency (IAEA) Operational Safety Review Team (OSART), scheduled to begin August 11, 2014, and provided an overview of the lessons learned from the evaluations to prepare for the supplemental inspection, Inspection Procedure 95001, for the White performance indicator for unplanned reactor scrams.

After the business part of the meeting ended, the NRC representatives allowed time for comments and questions from the public.

/RA/__________________________

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NFP-62

Enclosure:

Meeting Attendance List cc w/encl: Distribution via LISTSERV DISTRIBUTION:

See next page DOCUMENT NAME: Clinton EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JWojewoda:rj CLipa DATE 08/19/14 08/19/14 OFFICIAL RECORD COPY

Memorandum from Christine Lipa dated August 19, 2014

SUBJECT:

SUMMARY

OF THE AUGUST 7, 2014, NRC PUBLIC MEETING TO DISCUSS THE 2013 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT FOR CLINTON POWER STATION DISTRIBUTION w/encl: