ML14226A010

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review License Amendment Request to Revise CSP Implementation Schedule Milestone 8 (TAC Nos. MF4488 & MF4489)
ML14226A010
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/11/2014
From: Beltz T
Plant Licensing Branch III
To: Millen M
Point Beach
References
MF4488, MF4489
Download: ML14226A010 (2)


Text

NRR-PMDAPEm Resource From: Beltz, Terry Sent: Monday, August 11, 2014 12:54 PM To: Millen, Michael (Michael.Millen@nexteraenergy.com)

Cc: Clark, Roger; Locke, Kim; Pelton, David; Rycyna, John

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: License Amendment Request to Revise CSP Implementation Schedule Milestone 8 (TAC Nos. MF4488 &

MF4489)

Dear Mr. Millen:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated July 18, 2014 (Agencywide Documents Access and Management System Accession No. ML14202A574), NextEra Energy Point Beach, LLC (NextEra) submitted a license amendment request (LAR) to amend the Cyber Security Plan (CSP) for the Point Beach Nuclear Plant (Point Beach), Units 1 and 2. Specifically, NextEra proposes to revise the completion date of Milestone 8 of the CSP implementation schedule.

The purpose of this e-mail is to provide the final results of the NRC staffs acceptance review of this request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff in the Cyber Security Director of the Office of Nuclear Security and Incident Response has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Should you have any questions regarding this review, please contact me at (301) 415-3049.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 (301) 415-3049 Terry.Beltz@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 1501 Mail Envelope Properties (7E9EA9BB82325E46B07B0F04F99B40D8E350F4E5C3)

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: License Amendment Request to Revise CSP Implementation Schedule Milestone 8 (TAC Nos. MF4488 &

MF4489)

Sent Date: 8/11/2014 12:54:20 PM Received Date: 8/11/2014 12:54:00 PM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

"Clark, Roger" <Roger.Clark@nexteraenergy.com>

Tracking Status: None "Locke, Kim" <Kim.Locke@nexteraenergy.com>

Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>

Tracking Status: None "Rycyna, John" <John.Rycyna@nrc.gov>

Tracking Status: None "Millen, Michael (Michael.Millen@nexteraenergy.com)" <Michael.Millen@nexteraenergy.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2053 8/11/2014 12:54:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: