ML14213A376
| ML14213A376 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/06/2014 |
| From: | Ellen Brown Plant Licensing Branch III |
| To: | Harkness E FirstEnergy Nuclear Operating Co |
| Eva Brown, NRR/DORL 415-2315 | |
| References | |
| TAC MF3720 | |
| Download: ML14213A376 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 6, 2014 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -ACCEPTANCE REVIEW CONCERNING RELOCATION OF SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL (TAC NO. MF3720)(L-14-1 06)
Dear Mr. Harkness:
By letter dated March 25, 2014 (Agencywide Document Access and Management System (ADAMS) Accession No. ML14084A165), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request (LAR) for the Perry Nuclear Power Plant.
The proposed amendment would relocate specific technical specification (TS) surveillance requirement frequencies to a licensee controlled program. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the TSs) must fully describe the changes requested and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of the technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
E. Harkness If you have any questions, please contact Ms. Eva Brown at (301) 415-2315.
Sincerely, IRA/
Eva A. Brown, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440 cc: Distribution via Listserv
ML14213A376 NRR-106 OFFICE LPLI-1/PM LPLII-2/PM LPLIII-2/LA LPLIII-2/BC NAME DRender EBrown SRohrer TTate DATE 814/'4 8/4/14 8/6/14 8/6/14