ENCLOSURE 1 NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-261 H. B. Robinson License No. DPR-23 During the Nuclear Regulatory Commission (NRC) inspection conducted on January 4-8,
- 1988, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988),
the violation is listed below:
10 CFR 20.201(b) requires each licensee to make or cause to be made such surveys as (1) may be necessary for the licensee to comply with the regulations in 10 CFR Part 20, and (2) are reasonable under the circumstances to evaluate the extent of radiation hazards that may be present.
Plant Technical Specification 6.5.11.1.1.a requires written procedures to be established, implemented and maintained to cover the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A of Regulatory Guide 1.33, recommends written procedures for contamination control.
Plant Procedure HPP-004, Radiological Controls of Tools and Equipment, Revision 12, dated November 5, 1987, Section 10.1.4.2, states as release criterion that items must not display any detectable activity, i.e. no smearable beta contamination and less than 100 corrected counts per minute (ccpm) total beta contamination for unconditional release.
Contrary to the above, on September 14, 1987, the licensee released from the Radiation Control Area and subsequently released offsite an internally contaminated Dry Storage Canister-Mockup with contamination levels up to 190,000 disintegrations per minute per 100 square centimeters (dpm/100 cm2 ), which is approximately equivalent to 19,000 ccpm/100 cm2.
This is a Severity Level IV violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Carolina Power and.Light Company is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC
- 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice.
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance 8802030411 980128 PDR ADOCK 05000261 0D PDR
Carolina Power and Light Company Docket No. 50-261 H. B.
Robinson 2
License No. DPR-23 will be achieved. Where good cause is shown, consideration will be given to extending the response time. If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.