ML14190A991

From kanterella
Jump to navigation Jump to search

Ack Receipt of Util 861126 Proposal to Amend Physical Security Plan in Response to Miscellaneous Amends & Search Requirements.Addl Info Requested Re Implementation Schedule & Vital Area Access Controls within 30 Days
ML14190A991
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/25/1987
From: Eccleston K
Office of Nuclear Reactor Regulation
To: Utley E
Carolina Power & Light Co
References
TAC-65334 NUDOCS 8710010275
Download: ML14190A991 (3)


Text

Docket No. 50-261 Mr. E. E. Utley Senior Executive Vice President SEP 2 5 1987 Power Supply and Engineering and Construction Carolina Power & Light Company P.O. Box 1551 Raleigh, North Carolina 27602

Dear Mr. Utley:

SUBJECT:

MISCELLANEOUS AMENDMENTS/SEARCH REQUIREMENTS H.B. ROBINSON PLANT, UNIT 2 (TAC #65334)

This is to acknowledge receipt of the Carolina Power and Light Company letter, dated November 26, 1986, which transmitted a proposed amendment to the H.B. Robinson Plant, Unit 2, Physical Security Plan, in response to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed comments, please contact the reviewer, Jane Gibson, at (301) 492-8457.

Sincerely, Kenneth T. Eccleston, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ENCLOSURES:

As stated RSGB R/F Sec R/F JGibson CBuracker (2) cc w/enclosure:

Region II PAnderson See next page KEccleston Docket File 50-261 Case File NRC PDR RErickson wo/encl Local PDR LBush wo/encl

  • -Primisly fnnrilrrprl OFC
RSGB *
RSGB *
RSGB
RSGB *
PD II-1
PD II NAME :JGibson
CBuracker
LBush
RErickson
PAnderson
KEcclesto DATE :t/3 /87
/10/87
11/1 /87
  • /3 /87
/3 /87 j 0/87 6710010275 870925

. PDR ADOCK 05000261 F -

PDR

Docket No. 50-261 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

H.B. ROBINSON PLANT, UNIT 2 Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.

Reference 10 CFR 73.55.

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety. Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions. Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A

  1. 11).

Expand your commitment to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations. Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means). Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Expand your commitment to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety. Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Mr. 'E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:

Thomas A. Baxter, Esquire Mr. Dayne H. Brown, Chief Shaw, Pittman, Potts and Trowbridge Radiation Protection Branch 2300 N Street, N.W.

Division of Facility Services Washington, DC 20037 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff -

NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina P.O. Box 629 Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550 Mr. Avery Upchurch, Chairman Triangle J Council of Governments 100 Park Drive Post Office Box 12276 Research Triangle Park, NC 27709