ML14190A782

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation of Rev 1 to BN-TOP-1, Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants. Rept Acceptable
ML14190A782
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/01/1973
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: Allen R
BECHTEL GROUP, INC.
Shared Package
ML14190A781 List:
References
NUDOCS 8407240198
Download: ML14190A782 (1)


Text

B. Pawlicki WR-1 f4g Pfl Branch Chi PuR-1 File R.

1. tlecker 61W3.

Hanuer oc U.S. Boyd RD (4)

I. C. DeYoung A. Dromerick

\\flD. skohet JLe (2)

D).

Knuth Yr. Pq D. Allen, Vie President Beebtel Corporation Fifty Beale Street San ?rancisco, California 94119

Dear 11r. Allen:

The Pegu a,

leted its review of Beactel Corporation

'Topical

-1 slon 1, November 1, 1972 entItled "Teating Criteria or Integrated Leakage Rate Testing of Primary Containmnt Structures for 2uclear Power Plante."

A summary of our review is enclosned for your information.

As & result of our review, we bas concluded that the kformation in EN-TOP-1, flevision 1, November 1, 1972 will be acceptable by reference in applications forconsatruction permits and operating licueses.

Sincerely, Orainal signedbyt.,Deseaam U. C. DeYoung, Assistant Director for Pressurized Water Reactors Directorate of Licensing

Enclosure:

Topical Report Evaluation 6407240196 640717 PDR ADOCK 05000261

\\

P PDR RA FWR-1 AD:

TOO lo.. Asc4(..v 9-aw Acl sfe so aiw usesse-