Text

01 ptREG&(

Ao RUNITED STATES 0

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 29, 1980 Docket No. 50-261 LICENSEE:

CAROLINA POWER AND LIGHT COMPANY FACILITY: H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2

SUMMARY

OF MEETING HELD ON OCTOBER 15, 1980 WITH CAROLINA POWER AND LIGHT COMPANY TO DISCUSS H. B. ROBINSON 2 A meeting was held on October 15, 1980 between members of Carolina Power and Light Company (CP&L) and the NRC staff to discuss the recent and future inspections of the H. B. Robinson steam generators. The attendees list is attached.

CP&L has calculated from the eddy current inspections in April and August/

September, small corrosion rates for the steam generators. We indicated that because of the differences in inspection techniques between the April and August/September inspections there is a large uncertainty in the calcu lated corrosion rates.

Therefore, because of this and the current condition of the steam generators, we requested that CP&L, prior to full power operation of Robinson, provide the following:

1.

During the upcoming cycle, CP&L should commit to conduct a steam generator eddy current inspection prior to exceeding six effective full power months of operation. The inspection should utilize the same techni ques as employed during the August/September inspection. At least 45 days prior to the inspection, CP&L should submit to the staff for review, a report providing the scope and inspection techniques.

2. The current Tech Spec limits for total leakage (0.35 gpm) was acceptable provided CP&L recommends acceptable limits for ramp and step changes in leakage rates which if exceeded, the plant would be shut down and the steam generator inspected. Scope and -inspection techniques should be provided to the NRC for review at that time.
3. CP&L should provide a report on the steam generator chemistry control, improvements to date and planned future improvements. This could be submitted after the plant has reached full power operation.
4. A member of the NRC staff and/or consultant representing the staff should be allowed to witness any future inspections of the steam generator.

80110711570

Meeting Summary for H. B. Robinson 2 2 -

October 29, 1980 CP&L were in general agreement with the staff requests and will, within a few days, provide a letter providing their detailed responses to our requests.

Sydney Min r, Project Manager Operating Reactors Branch #1 Division of Licensina cc:

See next page VI

Meeting Summary for H. R. Robinson 2 3 -

October 29, 1980 Docket Files NRC PDR ORBI Reading NRR Reading H. Denton E. Case

0. Eisenhut R. Purple T. Novak R. Tedesco G. Lainas G. Zech S. Varga T. Ippolito R. Clark R. Reid D. Crutchfield

. J. Youngblood Schwencer J. Miller J. Wetmore B. Grimes H. Collins F. Pagano EPDB, DL Project Manager OELD OSD (3)

S. Showe, I&E C. Parrish R. Fraley, ACRS (16)

Principal Staff Participants Licensee Short Service List