ONS-2014-085, Oconee Nuclear Station, Units 1, 2, and 3 - Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23

From kanterella
(Redirected from ML14189A364)
Jump to navigation Jump to search
Oconee Nuclear Station, Units 1, 2, and 3 - Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23
ML14189A364
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/30/2014
From: Batson S L
Duke Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFST, Office of Nuclear Reactor Regulation
Shared Package
ML14189A363 List:
References
ONS-2014-085
Download: ML14189A364 (10)


Text

DIS Normal TH PRIORITY ______ OT 1) 00297 V M MCCREE REG ATL GA 2) 00391 S C PERRY ON03RC SPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO E TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS HERWISE IDENTIFIED BELOW 3) 00476 INPO ATLANTA, GA 4) 01732ONS DCRM ON02DM 5) 02362 E L CROWE INSPECTOR ON01NC 6) 02467 ELECT. LICENSING LIBRARY EC2ZF 7) 02542 ONS SITE COMPL (ORIG) ON03RC 8) 02543 S C PERRY ON03RC 9) 02666 RANDY HALL WASHINGTON, DC 10) 02718 US NRC DOC CNTL WASHNGTON DC 11) 03759 U S NUC REG WASHINGTON, DC 12) 04461 A N THAYER EC07R 13) 05749 ONS OSM OFFICE ON0103 14) 05957 S A HENDERSON ON03DM 15) 06187 OPS SUPPORT MAN FILE ON0101 Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE OCONEE NUCLEAR STATION UFSAR INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)RESP TEAM: 18320 Page 1 of 2 Date: 06/24/14 Document Transmittal

  1. DUK141750003 QA CONDITION

[: Yes N No OTHER ACKNOWLEDGEMENT REQUIRED N Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy 7800 Rochester Highway Document Management ON02DM Seneca, South Carolina 29672 Rec'd By Date I r 7 7 , r r rr r r ,------r--t-I-DOCUMENT NO QA COND REV #/DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 ll 1 12 13 14 115 TOTAL UFSAR ISFSI NA 023 12/31/13 OADM-06 CD1 1X CD1 lVI vi CD1 ICD1 ICD1 CD1 CD1 CD2 lV1 19 REMARKS: ****YEARLY UPDATE....

  • "UPDATE ACCORDING TO ATTACHED LETTER**S L BATSON VICE PRESIDENT OCONEE NUCLEAR STATION BY: S C PERRY SCP/AGS ON03RC/41?

DUKE Scoft L. Batson ENERGY, Oconee Nuclear Station Duke Energy ONOIVP 17800 Rochester Hwy Seneca, SC 29672 ONS-2014-085 o: 864.873.3274 f: 864.873.4208 June 30, 2014 Scott.Batson@duke-energy.com ATTN: Document Control Desk 10 CFR 72.4 Director, Division of Spent Fuel Storage and Transportation 10 CFR 72.48 U.S. Nuclear Regulatory Commission 10 CFR 72.70 11555 Rockville Pike Rockville, MD 20852-2746

Subject:

Duke Energy Carolinas, (LLC) (Duke Energy)Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 72-4, 50-269, 50-270, 50-287 Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23 Pursuant to 10 CFR 72.70(c), and in accordance with 10 CFR 72.4, Duke Energy hereby submits the Oconee Nuclear Station Independent Spent Fuel Storage Installation (ISFSI)Updated Final Safety Analysis Report (UFSAR), Revision 23.The effective date of the revision is December 31, 2013, as indicated at the bottom of each page. There were no changes made to the Oconee ISFSI UFSAR in Rev. 23. Attachment 1 is the 10 CFR 72.48 Annual Report.The Oconee ISFSI UFSAR, Revision 23, is provided on one compact disk (CD), Enclosure 1, Oconee Nuclear Station Independent Spent Fuel Storage Facility, 2013 Update -Rev. 23. The contents are in Adobe Acrobat Portable Document Format (pdf). As required by NRC guidance for electronic submissions, Attachment 2 provides a listing of the document components that comprise the enclosed CD. Attachment 3 provides the List of Effective Pages (LOEP) for Tables and Figures. Attachment 4 provides insertion instructions for those receiving hardcopy distribution.

This submittal document contains no regulatory commitments.

If you have any questions regarding this submittal, please contact Susan Perry at (864) 873-4370.I declare under penalty of perjury that the foregoing is true and correct. Executed on June 30, 2014.Sincerely, Scott L. Batson Vice President Oconee Nuclear Station www.duke-energy.com ONS-2014-085 Document Control Desk June 30, 2014 Page 2 Attachments:

1. 10 CFR 72.48 Annual Report 2. Document Components on CD 3. List of Effective Pages (LOEP) for Tables and Figures 4. Insertion Instructions (applicable for hardcopy distribution only)

Enclosure:

CD: Oconee Nuclear Station Independent Spent Fuel Storage Facility, 2013 Update -Rev 23 cc: Mr. Victor McCree, NRC Region II Administrator (CD)U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Project Manager (CD)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 Mr. Eddy Crowe (hardcopy)

Senior Resident Inspector Oconee Nuclear Station ONS-2014-085 Document Control Desk June 30, 2014 Attachment 1 Document Components on CD Filename ONS ISFSI Title Page 001 ONS ISFSI Rev 23 Text 002 ONS ISFSI Rev 23 Tables 003 ONS ISFSI Rev 23 Figures File Size 59 KB 1,538 KB 1,278 KB 26,181 KB ONS-2014-085 Document Control Desk June 30, 2014 Attachment 2 10 CFR 72.48 Annual Report Oconee Nuclear Station hereby informs the Nuclear Regulatory Commission that no changes, tests or experiments were made under the provisions of 10 CFR 72.48 between January 1, 2013 and December 31, 2013.

ONS-2014-085 Document Control Desk June 30, 2014 Attachment 3 List of Effective Pages (LOEP) for Tables and Figures (3 pages attached)

ONS-2014-085 Document Control Desk June 30, 2014 Attachment 3, Page 1 OCONEE ISFSI UFSAR -2013 UPDATE List of Effective Pages (LOEP) for Table and Figures The purpose of this list is to assure that the pages in the Tables and Figures section of your manual match the most recent issue, as well as to show a full accounting of all tables and figures, including those that have been deleted. The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.

Effective Table Table Title Date No.12/31/07 A-1 Design Parameters for the Oconee ISFSI 12/31/07 A-2 Summary of ISFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport Systems 12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI 12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson Counties, South Carolina (1980-2005) 12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson Counties, South Carolina (2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Direction and Speed by Stability Class 12/31/07 A-8 Soil Permeability Test Results 12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater)12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design 12/31/07 A-11 Transfer Cask Stress Analysis for Tornado Effects 12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A-13 Oconee ISFSI Radioactive Material Confinement Barriers 12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A-17 Gamma Energy Spectrum 12/31/07 A-18 Shielding Analysis Results 12/31/07 A-19 Summary of Estimated On-site Doses Resulting from ISFSI Operations (Per DSC Transfer to HSM)12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based on Labor Estimates for 2 X 10 Array 12/31/07 A-21 Neutron and Gamma Energy Spectrum 12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks 12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/13 ONS-201 4-085 Document Control Desk June 30, 2014 Attachment 3, Page 2 Effective Figure Figure Title Date No.12/31/07 B-1 Location of ISFSI 12/31/07 B-2 General Location 12/31/07 B-3 Site Plan 12/31/07 B-4 ISFSI Layout 12/31/07 B-5 Topography Within 5 Miles 12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevations of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey 12/31/07 B-9 Groundwater Survey at Station Site 12/31/07 B-10 Well Permeameter Test Apparatus 12/31/07 B-11 Formulae for Determining Permeability 12/31/07 B-12 General Site Area 12/31/07 B-13 Site Boring Plan 12/31/07 B-14 Core Boring Record 12/31/07 B-15 Core Boring Record 12/31/07 B-16 Core Boring Record 12/31/07 B-17 Core Boring Record 12/31/07 B-18 Core Boring Record 12/31/07 B-19 Core Boring Record 12/31/07 B-20 Core Boring Record 12/31/07 B-21 Core Boring Record 12/31/07 B-22 Core Boring Record 12/31/07 B-23 Core Boring Record 12/31/07 B-24 Core Boring Record 12/31/07 B-25 Core Boring Record 12/31/07 B-26 Core Boring Record 12/31/07 B-27 Core Boring Record 12/31/07 B-28 ISFSI Foundation Profile 12/31/07 B-29 Site Layout and Route 12/31/07 B-30 Site Plan 12/31/07 B-31 Transfer Cask Lifting Yoke Effective Date: 12/31/13 ONS-2014-085 Document Control Desk June 30, 2014 Attachment 3, Page 3 Effective Figure Figure Title Date No.12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool Area 12/31/07 B-34 Spent Fuel Pool Area 12/31/07 B-35 Spent Fuel Pool Area 12/31/07 B-36 NUHOMS System Loading Operations Flowchart 12/31/07 B-37 NUHOMS System Loading Operations Flowchart 12/31/07 B-38 NUHOMS System Loading Operations Flowchart 12/31/07 B-39 NUHOMS System Loading Operations Flowchart 12/31/07 B-40 NUHOMS System Loading Operations Flowchart 12/31/07 B-41 NUHOMS System Loading Operations Flowchart 12/31/07 B-42 Location of Dose Rates 12/31/07 B-43 Dose Rate Versus Distance From Surface of HSM 12/31/07 B-44 Dose From Filled HSM Array 12/31/07 B-45 Dose From Filled HSM Array 12/31/07 B-46 Radiation Zone Map of Modules Surface Dose Rates 12/31/07 B-47 Deleted Per 1991 Update 12/31/07 B-48 Fuel Assembly Burnup Requirements Effective Date: 12/31/13 ONS-2014-085 Document Control Desk June 30, 2014 Attachment 4 ONS ISFSI UFSAR Update Insertion Instructions (for hardcopy distribution only)1. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2013 LOEP Update.2. Replace entire text portions with the updated text portion (including the List of Abbreviations, Table of Contents, List of Tables, and List of Figures.)3. Update Tables and Figures according to the following instructions.

NOTE: There were no Tables or Figures updated during this revision.