ML14188B545

From kanterella
Jump to navigation Jump to search
Confirms That That Region II Will Conduct Second Program Review of ALARA Program During Wk of 880919 at Sites,Per 880815 Telcon.Info on Encl List Should Be Available to Insp Team at Sites by 880829
ML14188B545
Person / Time
Site: Brunswick, Robinson, 05000000
Issue date: 08/24/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8809070078
Download: ML14188B545 (2)


Text

ACCELERNAT4ULAIU DI RID; )TEM ACCESSION NBR:8809070078 DOC.DATE: 88/08/24 NOTARIZED: NO DOCKET #

FACIL:50-000 Generic Docket 05000000 50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 50-324 Brunswick Steam Electric Plant, Unit 2, Carolina Powe 05000324 50-325 Brunswick Steam Electric Plant, Unit 1, Carolina Powe 05000325 AUTH.NAME AUTHOR AFFILIATION COLLINS,D.M.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT:

Informs of upcoming review of advanced info to support assessment of util ALARA program.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL 4 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1

1 LO,R 2

2 SYLVESTER,E 2

2 INTERNAL: ACRS 2

2 AEOD 1

1 DEDRO 1

1 NRR MORISSEAU,D 1

1 NRR/DLPQ/PEB 11 1

1 NRR/DLPQ/QAB 10 1

1 NRR/DOEA DIR 11 1

1 NRR/DREP/EPB 10 1

1 NRR/DREP/RPB 10 2

2 NRR/DRIS DIR 9A 1

1 NRR/PMAS/ILRB12 1

1 NUDOCS-ABSTRACT 1

1 EBERMAN,J 1

1 OGC/HDS1 1

1 REG F 02 1

1 RES/DSIR DEPY 1

1 RGN2 FILE 01 1

1 EXTERNAL: LPDR 2

2 NRC PDR 1

1 NSIC 1

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28

Carolina Power and Light Company LAFfN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

ADVANCED INFORMATION TO SUPPORT NRC REGION II ASSESSMENT OF CP&L'S ALARA PROGRAM (CORPORATE, BRUNSWICK AND ROBINSON)

This letter is in reference to a telephone conversation at 2:00 p.m. on August 15, 1988, between Paul Fredrickson and Roger Shortridge, NRC and CP&L representatives from Harris Energy and Environmental

Center, Brunswick and Robinson Nuclear Plants. We informed you that during the week of September 12,
1988, an assessment team of 3 to 4 inspectors will be at Robinson to review your ALARA program. A second program review will be conducted at Brunswick the week of September 19, 1988, with one team member visiting the corporate office.

The scope of the assessment will cover all ALARA Program aspects for the years of 1983 through 1987.

In order to become better prepared to review the elements of your program, we request you make available to our inspection team, copies of information on the enclosed list, for corporate, Robinson and Brunswick as indicted (for 1983-1987).

We would appreciate it if this information were available at the sites by August 29, 1988.

We appreciate your assistance in this matter.

If you have any questions, please contact T. Collins, Team Leader at 404-331-3758.

Sincerely, Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards

Enclosure:

ALARA Documents cc w/encl:

(See page 2) 8809070078 880824 P

ADOCK 05000261 PNU