ML14188B373
| ML14188B373 | |
| Person / Time | |
|---|---|
| Site: | Harris, Brunswick, Robinson, 05000000 |
| Issue date: | 08/14/1987 |
| From: | Reyes L NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8708280068 | |
| Download: ML14188B373 (3) | |
Text
REGULATORY&FORMATION DISTRIBUTION S4EM (RIDS)
ACCESSION NBR:8708280068 DOC.DATE: 87/08/14 NOTARIZED: NO DOCKET #
FACIL:50-000 Generic Docket 05000000 50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 50-325 Brunswick Steam Electric Plant, Unit 1, Carolina Powe 05000325 50-324 Brunswick Steam Electric Plant, Unit 2, Carolina Powe 05000324 50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION REYESL.A.
Region 2, Office of Director RECIP.NAME RECIPIENT AFFILIATION UTLEYE.E.
Carolina Power & Light Co.
SUBJECT:
Clarifies misunderstanding re transmittal of AEOD repts for HB Robinson & Brunswick plants mentioned in SALP rept.
Assessments not transmitted until recently.
DISTRIBUTION CODE: IEO1D COPIES RECEIVED:LTR _
ENCL 0 SIZE:
C___
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1
ECCLESTONK 2
SYLVESTERE 2
BUCKLEY,B 2
INTERNAL: AEOD 1
1 DEDRO 1
NRR MORISSEAUD 1
NRR/DOEA DIR 1
NRR/DREP/EPB 1
NRR/DREP/RPB 2
NRR/DRIS DIR 1
NRR/PMAS/ILRB 1
0 MAN J 1
1 OGC/HDS1 1
G FIL 1
RON2 FILE 01 1
EXTERNAL: LPDR 3
NRC PDR 1
NSIC 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL
AUG 14 1987 c
Docket Nos. 50-261, 50-325, 50-324 and 50-400 License Nos. DRP-23, DRP-71, DPR-62 and NPF-63 Carolina Power and Light Company ATTN: i1r. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:
On August 4, 1987, we sent you three letters transmitting the NRC Office for Analysis and Evaluation of Operational Data (AEOD) assessment of the Licensee Event Reports (LERs) for your three nuclear facilities, H. B. Robinson Unit 2, Brunswick Units 1 and 2, and Shearon Harris Unit 1, for the current Systematic Assessment of Licensee Performance (SALP) period.
The letters for H. B.
Robinson and Brunswick mentioned a previous AEOD assessment report which covered the previous SALP period.
Our letter implied that these previous assessments had been officially sent to you.
In fact, these assessments were not sent to you at that time, in that we have only recently begun to transmit the AEOD evaluations to the assessed licensees. This misunderstanding does not change the AEOD evaluations of these two facilities.
Should you have any questions concerning this matter, please contact us.
Sincerely, Original Signed by Luis A. Reyes Luis A. Reyes, Director Division of Reactor Projects cc: LP. W. Howe, Vice President Brunswick Nuclear Project 1-C. R. Dietz, Plant General Manager RL A. Watson, Vice President Harris Nuclear Project jDl-L. Tibbitts, Director of Regulatory Compliance 6-L. Willis, Plant General Manager 1G-P. Beatty, Jr., Vice President Robinson Nuclear Project Department la-. E. Morgan, Plant General Manager bcc:
(See page 2) 8708280068 870814 PDR ADOCK 05000261 G
PDR d
Carolina Power and Light Company 2
bcc C. Barth, OGC
" NRC Resident Inspector
'Ac1Upchurch, Chairman, Triangle J Council of Governments L-Document Control Desk RHI RII 'iRHI PFr edrickson:cdg rrelli 4Brownlee 08/,/87 08/
/87 08/1 /87