ML14184B302
| ML14184B302 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/30/2014 |
| From: | Brabec R Southern California Edison Co |
| To: | Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML14184B302 (1) | |
Text
SOUTHERN CALIFORNIA
.JEDISON' An EDISON INTERNATIONAL& Company Richard C. Brabec Principal Manager, Nuclear Regulatory Affairs and Emergency Planning June 30, 2014 10 CFR 50.59(d)(2)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001
Subject:
Docket No. 50-206 Facility Change Report San Onofre Nuclear Generating Station Unit 1
Dear Sir or Madam:
This letter provides the Facility Change Report required by 10 CFR 50.59(d)(2) for San Onofre Unit 1 for the period from March 1, 2012 to March 1, 2014. There were no 10 CFR 50.59 evaluations identified for San Onofre Unit 1 in this reporting period.
There are no regulatory commitments made in this letter.
If you require additional information, please contact, Mr. Mark E. Morgan at (949) 368-6745.
ly, cc:
M. Dapas, Regional Administrator, NRC Region IV J. C. Shepherd, NRC Project Manager, San Onofre Unit 1 J. E. Whitten, NRC Region IV, San Onofre Unit 1 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92672 (949) 368-7418 PAX 87418 Fax: (949) 368-7575 lohn.Brabec@sce.com 15H -2