ML14184B069
| ML14184B069 | |
| Person / Time | |
|---|---|
| Site: | Robinson, Brunswick |
| Issue date: | 06/02/1993 |
| From: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Orser W CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 9306040364 | |
| Download: ML14184B069 (1) | |
Text
0 JUN 0 21993 3d Carolina Power & Light Company ATTN:
Mr. William S. Orser Executive Vice President 411 Fayetteville Street P.O. Box 1551 Raleigh, NC 27602
Dear Mr. Orser:
This refers to Mr. McCarthy's letter dated December 15, 1992, in which he stated CP&L's understanding that the route approved for the transport of irradiated reactor fuel by rail from the Robinson and Brunswick nuclear plants to the Shearon Harris nuclear plant, does not require reapproval as long as the route has been used or surveyed within the last two years.
Your understanding is basically correct, however, it is our practice to periodically review approved routes that are frequently used for any changes along the route. In this regard, we consider your existing route approval valid for two years from the date of this letter. At that time, you should request an extension to the approval by contacting this office.
Sincerely, Original Signed by
'SMi4UlS Z. LAQDONALD Charles E. MacDonald, Chief Transportation Branch Division of Industrial and Medical Nuclear Safety, NMSS OFC IMTB IMTB IMT NAME JCoo ~~
EEasto CM cDo n a1d DATE 05/f5/93 05/g/93 0_
_/93 C = COVER E = COVER & ENCLOSURE N = NO COPY FILE -
S:\\CP&L.LTR OFFICIAL RECORD COPY 0i4003r 9306040364 930602 PDR ADOCK 05000261 P
_