Advises That Emergency Response Data Sys (ERDS) Implementation Plan in Util Acceptable & That Testing Phase of ERDS Implementation Involves Testing W/ Halliburton NUS Environ Corp
ML14184A924
Person / Time
Site: Harris, Brunswick, Robinson  
Issue date: 03/23/1992
From: Adensam E
Office of Nuclear Reactor Regulation
To: Eury L
Carolina Power & Light Co
References
NUDOCS 9203270150
Download: ML14184A924 (5)


Text

~pvkREG(4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 March 23, 1992 Docket Nos. 50-261 50-325 and 50-324 50-400 Mr. Lynn W. Eury Executive Vice President Power Supply Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602

Dear Mr. Eury:

SUBJECT:

EMERGENCY RESPONSE DATA SYSTEM - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2, BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency Response Data System (ERDS) implementation plans for the H. B. Robinson Steam Electric Plant, Unit No. 2, Brunswick Steam Electric Plant, Units 1 and 2, and the Shearon Harris Nuclear Power Plant, Unit 1, which you submitted in a letter dated October 28, 1991.

Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of ERDS at your facilities. One area of concern was noted in the review of all three implementation plans. In Paragraph I.1 of all three plans you indicated that your ERDS parameters would include all of the required ERDS parameters "...

to the extent that the points currently exist on ERFIS..." 10 CFR Part 50, Appendix E, Section VI.2.a requires that all ERDS parameters which are resident in your plant computer systems be transmitted to ERDS.

Therefore, although there is no requirement to add additional points to your computers to support ERDS, if at a future date additional ERDS parameters are added to your system, they would be required to be transmitted to ERDS.

Be advised that the testing phase of ERDS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation. Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your ERDS testing will be a key element in the successful completion of ERDS implementation. The project manager at Halliburton NUS is Mr. Tony LaRosa, and he can reached on (208) 524-9227.

9203270150 920323 PDR ADOCK 05000261 F --

PDR

March 23, 1992 Mr. L. W. Eury

- 2 If you have any questions or problems in implementing the ERDS program, please contact Mr. John Jolicoeur, the NRC ERDS project manager, at (301) 492-4155 or your NRR Project Manager.

Sincerely, Orignal signed by:

Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation c:

See next page DISTRIBUTION

-Docket Eile MTaylor 17/G/21 NRC & LPDRs DRoss MNBB-3701 PD21 Rdg File RSpessard MNBB-3701 SVarga RPriebe MNBB-3206 GLainas EWeiss MNBB-3206 EAdensam DOA R/F RLo IRB R/F PAnderson JHufham RH OGC JWechselberger 17/G/21 EJordan MNBB-3701 JJolicoeur MNBB-3206 BMozafari TLe

  • SEE PREVIOUS CONCURRENCE IRB:DOA:AEOD IRB:DOA:AEOD IRB:DOA:AEOD D:DOA:AEOD JRJolicoeur*

RFPriebe*

EWWeiss*

RLSpessard*

2/11/92 ms 2/13/92 2/13/92 2/14/92 LA:PD PM. DII-1 PM:P I1PM:PDII-1 D* I PAn e BMozafari RLo U NLe J70--

E sam 3/L/92 3/1b/92 3/1J/92 3/16/92 3//7/92

Mr. L. W. Eury H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:

Mr. H. Ray Starling Mr. Dayne H. Brown, Director Manager - Legal Department Department of Environmental, Carolina Power & Light Company Health and Natural Resources P. 0. Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 P. 0. Box 27687 Raleigh, North Carolina 27611-7687 Mr. H. A. Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Vice President H. B. Robinson Steam Electric Plant Robinson Nuclear Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region IT U.S. Nuclear Regulatory Commission Mr. Heyward G..Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. Ray H. Chambers, Jr.

Columbia, South Carolina 29201 General Manager H. B. Robinson Stedm Electric Plant P. 0. Box 790 Hartsville, South Carolina 29550

Mr. L. W. Eury Brunswick S.eam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Mr. Russell B. Starkey, Jr.

Mr. H. A. Cole Vice President Special Deputy Attorney General Brunswick Nuclear Project State of North Carolina P. 0. Box 10429 P. 0. Box 629 Southport, North Carolina 28461 Raleigh, North Carolina 27602 Mr. H. Ray Starling Manager -

Legal Department Mr. Robert P. Gruber Carolina Power & Light Company Executive Director P. 0. Box 1551

.ublic Staff -

NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 Mr. Kelly Holden, Chairman Board of Commissioners P. 0. Box 249 Bolivia, North Carolina 28422 Resident Inspector U. S. Nuclear Regulatory Commission Star Route 1 P. 0. Box 208 Southport, North Carolina 28461 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Director Divisicn of Radiation Protection N. C. Department of Environmental, Commerce ana Natural Resources P. 0. Box 27687 Raleigh, North Carolina 27611-7587 Mr. J. W. Spencer Plant General.Manager Brunswick Steam Electric Plant P. 0. Box 10429 Southport, North Carolina 28461

Mr. L. W. Eury Shearon Harris cc:

Mr. H. Ray Starling Regional Administrator, Region II Manager -

Legal Department U.S. Nuclear Regulatory Commission Carolina Power & Light Company 101 Marietta Street P. 0. Box 1551 Suite 2900 Raleign, North Carolina 27502 Atlanta, Georgia 30323 Resident Inspector/Harris NPS Mr. C. S. Hinnart

,/c U. S. Nuclear Regulatory Commission Plant General Manager Route 1. Box 315B Harris Nuclear Plant New Hill, North Carolina 27562 P. C'. Box 165 New Hill, North Carolina 27562 Mr. R. 3. Richey, Vice President Harris Nuclear Project Mr. Dayne H. Brown, Director Harris Nuclear Plant Division of Radiation Protection P. 0. Box 16 N. C. Department of Environmental, New Hill, North Carolina 27562 Commerce & Natural Resources P. 0. Box 27687 Mr. H. A. Cole Raleigh, North Carolina 27611-7687 Special Deputy Attorney General State of North Carolina P. 0. Box 629 Raleigh, North Carolina 27602