I0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 July 9, 1991 Docket No.
50-261 Mr. Lynn W. Eury Executive Vice President Power Supply Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602
Dear Mr. Eury:
SUBJECT:
INSERVICE TESTING PROGRAM AND RELIEF REQUEST FOR PUMPS AND VALVES H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (TAC NO. 61993)
By letter dated April 15, 1988, you submitted the second ten-year interval inservice testing (IST) program and associated relief requests for H. B.
Robinson Steam Electric Plant, Unit No. 2 (HBR-2), covering the interval from March 7, 1981, to February 19, 1992. The staff has reviewed the IST program and the requests for relief with technical assistance from EG&G Idaho Inc.
(EG&G).
The staff adopts the evaluation and conclusions contained in the enclosed Technical Evaluation (TER) prepared by EG&G. The staff's Safety Evaluation (SE) which summarizes the conclusions of the TER is also enclosed. Table 1 of the SE contains the staff's disposition of the relief requests. As indicated in TER section 3.1.1.1, the relief request related to the containment isolation valves leak testing, relief request 5.3.1, is still under staff review. You will be informed of the conclusion of the review when it is available.
For the relief requests other than relief request 5.3.1 discussed above, the staff has determined that granting the relief, pursuant to 10 CFR 50.55a(a)(3)(i),
(a)(3)(ii) and (g)(6)(i), is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. In making this determination, the staff has considered the alterna tive testing being implemented, compliance resulting in a hardship without a compensating increase in safety, and the impracticality of performing the required testing considering the burden if the applicable ASME Boiler and Pressure Vessel Code requirements were imposed. The last column of Table 1 of the enclosed SE identifies the regulation under which the requested relief is granted. This letter grants the relief.
You are required to implement the IST program as submitted with the disposition of the relief requests as discussed in the SE. Program changes such as additional relief requests or changes to relief requests should be submitted for staff review and should not be implemented prior to review and 9T07190192 9i709 PDR ADOCK 05000261 P
\\
Mr. Eury July 9, 1991 approval by the NRC. New or revised relief requests meeting the positions in Generic Letter 89-04, Enclosure 1, should be submitted to the NRC staff but can be implemented provided the guidance in Generic Letter 89-04, Section D, is followed.
If you have questions concerning this letter please let us know.
Sincerely, Orignal signed by:
Elinor G. Adensam for:
Anthony Mendiola, Acting Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
See next page OFC
- LA:P W:PM:PD21 PRE
- OGC
- RE.
-~-
NAME
- PAnd r
- RLo:dt iola DATE :4/3D/91
- 7 /91
//9191 OFFICIAL RECORD COP Document Name:
Mr. L. W. Eury H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:
Mr. H. Ray Starling Mr. Dayne H. Brown, Director Manager - Legal Department Department of Environmental, Carolina Power & Ligth Company Health and Natural Resources P. 0. Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 P. 0. Box 27687 Raleigh, North Carolina 27611-7687 Mr. H. A. Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Manager, Robinson Nuclear Project H. B. Robinson Steam Electric Plant Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Heyward G. Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. R. Morgan Columbia, South Carolina 29201 General Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, South Carolina 29550
46, DISTRIBUTION
'Docket File' NRC PDR Local PDR S. Varga 14-E-4 G. Lainas 14-H-3 L. Reyes RII K. Dempsey 7E23 J. Norberg 7D2 A. Mendiola 14-B-20 P. Anderson 14-B-20 R. Lo 14-B-20 OGC 15-B-18 E. Jordan MNBB-3302 ACRS (10)
P-315