ML14184A563
| ML14184A563 | |
| Person / Time | |
|---|---|
| Site: | Harris, Brunswick, Robinson, 05000000 |
| Issue date: | 03/02/1984 |
| From: | Robert Lewis NRC/RGN-II, NRC/IE |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8403160283 | |
| Download: ML14184A563 (1) | |
Text
Carolina Power and Light Company MAR 2 1984 ATTN:
Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT:
10 CFR 50 APPENDIX R - FIRE PROTECTION WORKSHOP Recent NRC inspections of plants located in other Regions have identified a number of areas in which the requirements of the Fire Protection Rule of 10 CFR 50 Section 48 and Appendix R have not been adequately implemented.
Therefore, a workshop meeting will be conducted on March 16, 1984, in the Region II 29th floor conference room to discuss the Appendix R requirements and the results of the recent Appendix R inspections to help resolve any misunder standings associated with the requirements.
This meeting will provide open discussion with the attendees concerning any questions pertinent to the Appendix R requirements. The meeting will begin at 9:00 a.m. and end at approxi mately 4:00 p.m.
Participants in the meeting will be personnel from NRC's Offices of Nuclear Reactor Regulation and Inspection and Enforcement.
Members of your staff are invited to this meeting.
However, in view of the limited size of our conference room, it is requested that you limit the number of attendees to approximately six.
It is suggested that personnel from your licensing, design engineering and operational plant staff as well as a repre sentative from the architectural and engineering and/or consulting firm who performed the Appendix R review of your plant attend this meeting.
Should you have any questions concerning this letter please let us know.
Sincerely Richard C. Lewis, Director Division of Project and Resident Programs cc R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project General Manager G. P. Beatty, Jr., Manager
- 0o Robinson Nuclear Project Department R. E. Morgan, Plant General Manager 4o P. W. Howe, Vice President a1 Brunswick Nuclear Project
- M 0 C. R. Dietz, Plant General Manager oo0 bcc Document Control Desk RII RII II on
State of North Carolina State of South Carolina Ao4't J01shinski RLewis NRC Resident Inspector 02 /84 02/,-/84 2A//84 WHMill r:es TEConlon n'
/ /oA n);t 10A