May 8, 1996 Mr. C. S. Hinnant, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2, CONCERNING MAIN STEAM SAFETY VALVE TESTING (TAC NO. M94613)
Dear Mr. Hinnant:
On January 29, 1996, you submitted an amendment request regarding main steam safety valve (MSSV) testing for the H. B. Robinson Steam Electric Plant, Unit No. 2. As a result of our review, we have determined a need for the following request for additional information (RAI).
- 1.
You did not indicate in the submittal that all events were considered in the assessment. Confirm that all events, Section 5.2.2 - Overpressure Protection and Chapter 15 - Accident Analyses, were considered.
- 2.
Specifically, identify which events were verified through evaluation and which were reanalyzed, and justify each method of verification.
- 3.
Outline the criteria used in each verification, whether by evaluation or reanalysis.
- 4.
Describe how you ensure that the +/-3% drift in the MSSV setpoint will not affect the MSSV's ablility to prevent the maximum steam generator design pressure from being compromised.
Your written response to the RAI is expected within 30 days of the receipt of this letter.
Sincerely, (Original Signed By)
Brenda Mozafari, Project Manager Project Directorate II-1 Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation Distribution C':Doc-t--ile SBrewer Docket No. 50-261 PUBLIC EWeiss PDII-1 RF R.Jones SVarga ACRS cc:
See next page JZwolinski OGC FILENAME -
G:Robinson\\ROB94613.RAI OFFICE LA:PDII-1 PM:P D:PDII-1 NAME EDunnington Bl1
~
o arIn EImbro.
1 DATE 05/06/96 05/06/96 95L06/96 COPY es No (yes/ No Ye No OFFICIALRECORD COPY 9605140416 960508 PDR ADOCK 05000261 P
Mr. C. S. Hinnant H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:
Mr. William D. Johnson Mr. Dayne H. Brown, Director Vice President and Senior Counsel Department of Environmental, Carolina Power & Light Company Health and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Max Batavia, Chief H. B. Robinson Steam Electric Plant South Carolina Department of Health 2112 Old Camden Road Bureau of Radiological Health Hartsville, South Carolina 29550 and Environmental Control 2600 Bull Street Regional Administrator, Region II Columbia, South Carolina 29201 U.S. Nuclear Regulatory Commission 101 Marietta St., N.W., Ste. 2900 Mr. J. Cowan Atlanta, Georgia 30323 Manager Nuclear Services and Environmental Mr. Dale E. Young Support Department Plant General Manager Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 - Mail OHS7 H. B. Robinson Steam Electric Plant Raleigh, North Carolina 27602 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Milton Shymlock U. S. Nuclear Regulatory Commission Public Service Commission 101 Marietta Street, N.W. Suite 2900 State of South Carolina Atlanta, Ga. 3023-0199 Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. R. M. Krich Manager -
Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550