ML14183A612

From kanterella
Jump to navigation Jump to search

Forwards SE Re Request for Relief from Section XI Requirement on Temporary Repair of Class 3 Pipe for Plant,Unit 2.Relief Granted Until Next Scheduled Outage Exceeding 30 Days
ML14183A612
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/26/1995
From: Mozafari B
Office of Nuclear Reactor Regulation
To: Hinnant C
CAROLINA POWER & LIGHT CO.
Shared Package
ML14183A613 List:
References
TAC-M90670, NUDOCS 9502030283
Download: ML14183A612 (3)


Text

January 26, 1995g Mr. C. S. Hinnant, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 Post Office Box 790 Hartsville, South Carolina 29551-0790

SUBJECT:

REQUEST FOR RELIEF FROM SECTION XI REQUIREMENTS ON A TEMPORARY REPAIR OF A CLASS 3 PIPE - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (TAC NO. M90670)

Dear Mr. Hinnant:

On October 14, 1994, as supplemented November 15, 1994, Carolina Power & Light Company (the licensee) requested relief from the Section XI repair requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (Code) for repair of pinhole leaks detected in piping in the chemical and volume control system during operation of the H. B. Robinson Steam Electric Plant, Unit No. 2 (HBR).

The licensee requested relief on the grounds of impracticality, stating that performing Code required repairs at this time would be impossible without a unit shutdown.

The NRC finds that the Code requirements in this case are impractical and would result in undue hardship without a compensating increase in the level of quality and safety. Under 10 CFR 50.55a(g)(6)(i), relief is granted until the next scheduled outage exceeding 30 days, but no later than the next scheduled refueling outage. The piping must then be repaired or replaced in accordance with the Code.

Our Safety Evaluation on this request is enclosed.

Sincerely, (Original Signed By)

Brenda L. Mozafari, Project Manager Project Directorate II-1 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation Docket No.:

50-261

Enclosure:

Safety Evaluation cc w/enclosure:

See next page DOCUMENT NAME:

G:\\ROBINSON\\ROB90670. LTR OFFICE LA* D 1

PMPDII-1 D:PDII-1 0GC NAME PA erso BM'fari WBatem DATE 01/ )1/95 01/10/95 01/U4 /95 01/ 9-/95 COPY

'Yes No Ye5/No Yes/No Yes/No OFFICIAL RECORD COPY 9502030283 950126 PDR ADOCK 05000261 P

PDR

Mr. C. S. Hinnant H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:

Mr. R. E. Jones Mr. Dayne H. Brown, Director General Counsel -

Legal Department Department of Environmental, Carolina Power & Light Company Health and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 Post Office Box 27687 Raleigh, North Carolina 27611-7687 Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Max Batavia, Chief H. B. Robinson Steam Electric Plant South Carolina Department of Health 2112 Old Camden Road Bureau of Radiological Health Hartsville, South Carolina 29550 and Environmental Control 2600 Bull Street Regional Administrator, Region II Columbia, South Carolina 29201 U.S. Nuclear Regulatory Commission 101 Marietta St., N.W., Ste. 2900 Mr. H. W. Habermeyer, Jr.

Atlanta, Georgia 30323 Vice President Nuclear Services Department Mr. Dale E. Young Carolina Power & Light Company Plant General Manager Post Office Box 1551 Carolina Power & Light Company Raleigh, North Carolina 27602 H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville Memorial Library Hartsville, South Carolina 29550 147 West College Avenue Hartsville, South Carolina 29550 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. R. M. Krich Manager - Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550

Distribution Docket File PUBLIC PDII-1 RF WRussell/FMiraglia RZimmerman RSpessard, D/DOTS JLieberman, D/OE SVarga JZwol inski OGC JStrosnider EJordan, D/AEOD GHill, (4)

ACRS (4)

OPA OC/LFDCB G. Tracy EDO EMerschoff, RII