Amend 173 to License DPR-23,changing TS to Allow Deferral of RCP Flywheel Insp Until Outage 18,scheduled for Spring of 1998
ML14183A350
Person / Time
Site: Robinson 
Issue date: 08/09/1996
From: Imbro E
NRC (Affiliation Not Assigned)
To:
Shared Package
ML14183A351 List:
References
NUDOCS 9608120282
Download: ML14183A350 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 173 License No. DPR-23

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power & Light Company (the licensee), dated June 6, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i)-that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance.of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B. of Facility Operating License No. DPR-23 is hereby amended to read as follows:

9608120282 960809 PDR ADOCK 05000261 P

PDR

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 173, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION Eugene V. Imbro, Director Project Directorate II-1 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 9, 1996

ATTACHMENT TO LICENSE AMENDMENT NO. 173 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised area is indicated by a marginal line.

Remove Page Insert Page 4.2-6 4.2-6

  • s 2 and Class 3 components were(bsen based on Regulatory Guide 1.26 and ANSI N18.2 and N18.2a "Nuclear Safety Criteria for the Design of stationary Pressurized Water Reactor Plants."

The Surveillance Requirements for inspection of the steam generator tubes ensure that the structural integrity of this portion of the RCS will be maintained. The program for inservice inspection of steam generator tubes is based on a modification of Regulatory Guide 1.83, Revision 1.

Inservice inspection of steam generator tubing is essential in order to maintain surveillance of the conditions of the tubes for evidence of mechanical damage or progressive degradation. Inservice inspection of steam generator tubing also provides a means of characterizing the nature and cause of any tube degradation so that corrective measures can be taken.

Wastage-type defects will be minimized with proper chemistry treatment of the secondary coolant. If defects or significant degradations should develop in service, this condition is expected to be detected during inservice steam generator tube examinations. Plugging will be required for all tubes with imperfections exceeding the plugging.limit.

Steam generator tube inspections by means of eddy current testing have demonstrated the capability to reliably detect degradation that has penetrated 20% of the original tube wall thickness.

Whenever the results of any steam generator tubing inservice inspection fall into Category C-3, these results will be reported to the Commission prior to resumption of plant operation. Such cases will be considered by the Commission on a case-by-case basis and may result in a requirement for analysis, laboratory examinations, tests, additional eddy current inspection, and revision of the Technical Specifications.

4.2.2 Materials Irradiation Surveillance Specimens The reactor vessel material surveillance specimens shall be removed and examined to determine changes in their material properties, as required by Appendix H to 10CFR50.

4.2.3 Primary Pump Flywheels The flywheels shall be visually examined at the first refueling after each ten year inspection. At the fourth refueling after each ten year inspection and at each fourth refueling thereafter, the outside surfaces shall be examined by ultrasonic methods. The examinations scheduled for Refueling Outage 17. in 1996, may be deferred to Refueling Outage 18.

4.2-6 Amendment No. 899.1I0.162,.173