ML14183A347

From kanterella
Jump to navigation Jump to search
Amend 172 to License DPR-23,changing TS Section 3.8 to Specify Spent Fuel Building Refueling Filter Fan & at Least One Containment Purge Fan Shall Be Shown to Operate within Plus or Minus 10% of Design Flow
ML14183A347
Person / Time
Site: Robinson 
Issue date: 08/06/1996
From: Imbro E
NRC (Affiliation Not Assigned)
To:
Shared Package
ML14183A348 List:
References
NUDOCS 9608080146
Download: ML14183A347 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 172 License No. DPR-23

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power & Light Company (the licensee), dated July 17, 1995, as supplemented May 2, 1996, and July 1, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B. of Facility Operating License No. DPR-23 is hereby amended to read as follows:

9608080146 960806 PDR ADOCK 05000261 P

PDR

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 172, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION Eugene V. Imbro, Director Project Directorate II-1 Division of Reactor Projects -

I/Il Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 6, 1996

ATTACHMENT TO LICENSE AMENDMENT NO. 172 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET'NO. 50-261 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised area is indicated by a marginal line.

Remove Page Insert Page 3.8-3 3.8-3

j.

If any of the specified limiting conditions for refueling are not met. refueling of the reactor shall cease; work shall be initiated to correct the conditions so that the.specified limits are met; and no operations which may increase the reactivity of the core shall be made.

k.

The reactor shall be subcritical as required by 3.10.8.3.

3.8.2 The Spent Fuel Building Filter system and the Containment Purge filter system shall satisfy the folldwing conditions:

a.

The results of the in-place cold DOP and halogenated hydrocarbon tests at greater than 20 percent design flows on HEPA filters and charcoal absorber banks shall show at 99 percent DOP removal and at 99 percent halogenated hydrocarbon removal.

b.

Verification by way of laboratory carbon sample analysis from the Spent Fuel Building filter system carbon and the Containment Purge filter system carbon to show : 90 percent radioactive methyl iodide removal in accordance with test 5.b of Table 5-1 of ANSI/ASME N509-1976 except that ;t 70 percent relative humidity air is required.

c.
1.

The Spent Fuel Building refueling filter fan shall be shown to operate within +/- 10% of the design flow.

2.

At least one Containment purge filter fan shall be shown to operate within +/- 10% of the design flow and must be operable during core alterations or movement of irradiated

.fuel assemblies, or at least one automatic containment isolation valve in each line penetrating the containment which provides a direct path from the containment atmosphere to the outside atmosphere shall be securely closed.

d.

During fuel handling operations, the relative humidity (R.H.) of the air processed by the refueling filter systems shall be :5 70 percent.

e.

From and after the date that the Spent Fuel Building filter system is made or found to be inoperable for any reason. fuel handling operations in the Spent Fuel Building shall be terminated immediately.

3.8-3 Amendment No..g 172