ML14183A317

From kanterella
Jump to navigation Jump to search
Amend 164 to License DPR-23,changing Testing Frequency of Turbine Overspeed Protection Valves from Monthly to Quarterly to Implement Enhancement Recommended by GL 93-05
ML14183A317
Person / Time
Site: Robinson 
Issue date: 04/27/1995
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14183A318 List:
References
DPR-23-A-164, GL-93-005 NUDOCS 9505040281
Download: ML14183A317 (4)


Text

p9REG~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 164 License No. DPR-23

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power & Light Company (the licensee), dated November 4, 1994, as supplemented April 6, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B. of Facility Operating License No. DPR-23 is hereby amended to read as follows:

9505040281 950427 PDR ADOCK 05000261 P

_PDR

-2 B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 164, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-1 Division of Reactor Projects -

I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: April 27, 1995

ATTACHMENT TO LICENSE AMENDMENT NO. 164 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.

,Remove Page Insert Page 4.1-12 4.1-12

0 TABLE 4.1-3 FREQUENCIES FOR EQUIPMENT TESTS Maximum Time Between Check Frequency Tests

1.

Control Rods Rod drop times of Each refueling NA*

all full length shutdown rods

2.

Control Rod Partial movement of Every 2 weeks during 20 days all full length reactor critical rods operations

3.

Pressurizer Set point Each refueling NA Safety Valves shutdown

4.

Main Steam Set point Each refueling NA Safety Valves shutdown

5.

Containment Functioning Each refueling NA Isolation Trip shutdown

6.

Refueling Functioning Prior to each NA System refueling shutdown Interlocks

7.

Service Water Functioning Each refueling NA System shutdown

8.

DELETED

9.

Primary System Evaluate Daily when reactor NA Leakage coolant system is above cold shutdown condition

10.

Diesel Fuel Fuel Inventory Weekly 10 days Supply

11.

DELETED

12.

Turbine Steam Closure Quarterly during 115 Stop, Control, power operation and days Reheat Stop, prior to startup and Interceptor Valves 4.1-12 Amendment No. 142, Y93, 164