Text
RE 0'
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 19, 1992 Docket No. 50-261 Mr. R. A. Watson Senior Vice President Nuclear Generation Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602
Dear Mr. Watson:
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - RELIEF REQUESTS FOR THIRD TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN (TAC NO. M81310)
By a letter dated August 1991, Carolina Power & Light Company (licensee) submitted to the NRC the Third Ten-Year Interval Inservice Inspection (ISI)
Program and the associated requests for relief from the American Society of Mechanical Engineers (ASME) Code Requirements that the licensee determined to be impractical to perform during the Third Ten-Year Inservice Inspection Interval for the H. B. Robinson Steam Electric Plant, Unit No. 2. The licensee provided additional information in letters dated February 13, 1992, and June 18, 1992. The NRC staff with technical assistance from its contractor, the Idaho National Engineering Laboratory, has reviewed and evaluated the requ'ests and supporting information.
Based on the information submitted, the NRC staff agrees with the conclusions and recommendations presented in the enclosed Technical Evaluation Report, EGG-MS-10352. Furthermore, the staff has concluded that the H. B. Robinson Steam Electric Plant, Unit No. 2, Third Ten-Year Interval Inservice Inspection Program Plan, Revision 0, with the additional information provided and the specific written relief, constitutes the basis for compliance with 10 CFR 50.55a(g) and Technical Specification 4.0.1 and is, therefore, acceptable. In addition, pursuant to 10 CFR 50.55a(g)(6)(i), Request for Relief Nos. 1, 2,-3, 5, 8, 12, and 18 are granted as requested. Request for Relief No. 13 is granted with the conditions specified in the Technical Evaluation Report attached. The remainder of the relief requests were withdrawn by the licensee.
As discussed in the enclosed Safety Evaluation, the NRC finds that the Code required examinations are impractical to perform and the licensee's proposed alternatives provide an acceptable level of quality and safety. Further, the granting of these requests will not significantly reduce assurance of the 22001.9 9210260381 921019 PDR ADOCK 05000261 P
PDR O
,Mr. R.
October 19, 1992 plant's structural integrity and safety. Relief pursuant to 10 CFR 50.55a(g)
(6)(i) is, therefore, authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if.
the requirements were imposed on the facility.
Sincerely, Original signed by:
Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects -
I/11 Office of Nuclear Reactor Regulation
Enclosures:
(1)
Safety Evaluation (2)
Technical Evaluation Report cc w/enclosure:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD21 Reading File SVarga GLainas EAdensam BMozafari PAnderson OGC ACRS (10)
LMerschoff, RH OFFICE Lr:
- pRPE NAME PA ozafari:dt j EAde sam DATE
/0 / /92
/0/
/92
/0/7/92
/
2 Document Name:
ROB81310.LTR
Mr. R. A. Watson H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:
Mr. H. Ray Starling Mr. Dayne H. Brown, Director Manager -
Legal Department Department of Environmental, Carolina Power & Light Company Health and Natural Resources P. 0. Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 P. 0. Box 27687 Raleigh, North Carolina 27611-7687 Mr. H. A. Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff -
NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Vice President H. B. Robinson Steam Electric Plant Robinson Nuclear Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Heyward G. Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. Ray H. Chambers, Jr.
Columbia, South Carolina 29201 General Manager H. B. Robinson Steam Electric Plant Mr. R. B. Starkey P.O. Box 790 Vice President Hartsville, South Carolina 29550 Nuclear Services Department Carolina Power & Light Company Public Service Commission P.O. Box 1551 State of South Carolina Raleigh, North Carolina 27602 P.O. Drawer 11649 Columbia, South Carolina 29211