Forwards Exam Rept 50-261/94-300 for Period of 940711-29 & Notice of Violation
ML14182A269
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/26/1994
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hinnant C
CAROLINA POWER & LIGHT CO.
Shared Package
ML14182A270 List:
References
NUDOCS 9409070056
Download: ML14182A269 (6)


See also: IR 05000261/1994300

Text

jrIN.I -.)Ile.I

1

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409070056

DOC.DATE:

94/08/26

NOTARIZED:

NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C

05000261

AUTH.NAME

AUTHOR AFFILIATION

GIBSON,A.F.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

HINNANT,C.S.

Carolina Power & Light Co.

P

SUBJECT: Forwards exam rept 50-261/94-300 for period of 940711-29 &

notice of violation.

R

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR

ENCL

SIZE: 5

TITLE: Operator Licensing Examination Reports

NOTES:

0

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

MOZAFARI,B

1

1

INTERNAL: NRR/DRGH/HHFBPT

1

0

NRR/DRCH/HOLB10

1

1

02

1

1

RGN2

FILE

01

1

1

T

EXTERNAL: NOAC

1

1

NRC PDR

1

1

2

D

O

C

U

M

E

N

T

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL

DESK, ROOM Pl-37 (EXT 504-2083) TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI

TOTAL NUMBER OF COPIES REQUIRED: LTTR

8 ENCL

7

August 26, 1994

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN: Mr. C. S. Hinnant

Vice President

H. B. Robinson Steam Electric Plant

Unit 2

P. 0. Box 790

Hartsville, SC 29550-0790

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC EXAMINATION REPORT NO. 50-261/94-300)

This refers to the Nuclear Regulatory Commission (NRC) administered

examinations led by Ronald F. Aiello during the period of July 11-29, 1994.

The examinations were administered to employees of your company who had

applied for licenses to operate the H. B. Robinson Steam Electric Plant. At

the conclusion of the examination, the examinations and preliminary findings

were discussed with those members of your staff identified in the NRC

Examination Report, Enclosure 2.

Based on the results of this examination, certain of your activities appeared

to be in violation of NRC requirements, as specified in Enclosure 1, Notice of

Violation (Notice). This violation is of concern because the inactive

operator or senior operator may not be fully aware of current plant status if

that operator does not perform a complete tour of the plant under the

direction of an active operator or senior operator, as appropriate, prior to

the reactivation of his or her license.

Your failure to assure that the qualifications and status of reactor operators

are current and valid prior to assumption of licensed functions is similar to

previous NRC findings. Such findings included, (1) adequacy of Emergency

Operating Procedures and their verification and validation, (2) a large

backlog of procedure changes, and (3) assuring the qualifications and status

of reactor operators are current and valid prior to assumption of licensed

functions. Additionally, this report addresses a lack of availability of

breaker operating tools, weak examination results and failure to have required

reading to assure operators are informed. We believe that your failure to

take broad corrective actions to assure that an entire problem area is

corrected, instead of responding to specific deficiencies noted in our past

inspection and examination reports, is the root cause of continuing poor

performance in the areas of operator performance, training and procedural

development and control.

We request that you address these concerns in

addition to your required response to the cited violation within 30 days of

the date of this letter. We additionally invite you to the Region II offices

9409070056 940826

PDR

ADOCK 05000261

V

PDR

Carolina Power & Light Co.

2

so you may present your corrective actions to this violation and the related

programmatic weaknesses.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to take to prevent recurrence. After reviewing your response

to this Notice, including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

In addition, the enclosed Examination Report identifies activities that

violated NRC requirements that will not be subject to enforcement action

because the licensee's efforts in identifying and/or correcting the violation,

meet the criteria specified in Section VII.B of the Enforcement Policy.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

A copy of the Facility Comments regarding the written examination is included

in this report as Enclosure 3. The NRC Resolution of Facility Comments is

included as Enclosure 4.

A Simulator Facility Report is included in this report as Enclosure 5. A copy

of the written examination questions and answer key, as noted in Enclosure 6,

was provided to members of your training staff at the conclusion of the

examination.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely,

(Original Signed by A. F. Gibson)

Albert F. Gibson, Director

Division of Reactor Safety

Enclosures:

(See page 3)

Carolina Power & Light Co.

3

Enclosures:

1. Notice of Violation

2. NRC Examination Report

3. Facility Comments

4. NRC Resolution of Facility Comments

5. Simulator Facility Report

6. Written Examinations and Answer

Keys (Document Control Desk Only)

cc w/encls 1, 2, 3, 4, and 5:

M. P. Pearson

Plant Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

H. W. Habermeyer, Jr.

Vice President

Nuclear Services Department

Carolina Power & Light Company

P. 0. Box 1551

- Mail 0HS7

Raleigh, NC 27602

R. Krich, Manager

Regulatory Compliance

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Max Batavia, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environmental

Commerce & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

Hartsville Memorial Library

147 W. College

Hartsville, SC 29550

cc w/encls cont'd:

(See page 4)

Carolina Power & Light Co.

4

cc w/encls cont'd:

H. Ray Starling

Manager - Legal Department

Carolina Power and Light Co.

P. 0. Box 1551

Raleigh, NC 27602

Karen E. Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

Public Service Commission

State of South Carolina

P. 0. Box 11649

Columbia, SC 29211

Max Herrell

Training Manager

H. B. Robinson Steam Electric Plant

Robinson Nuclear Project Department

P. 0. Box 790

Hartsville, SC 29550

bcc w/encls 1, 2, 3, 4, and 5:

B. Mozafari, NRR

S. Richards, NRR

A. Gibson, RII/DRS

B. Mallett, RII/DRS

H. Christensen, RII/DRP

G. Hallstrom, RII/DRS

F. Jaggar, INEL

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

bcc w/encls 1, 2, 3, 4, 5, and 6:

Document Control Desk

bcc cont'd:

(See page 5)

Carolina Power & Light Co.

5

bcc w/o encls:

IMS, RH

SEND

OFC

RII:DRS

RII:DRS

RII:DRS

RI I:DRP

RII:DRS

TO

NAME

RAieLLo/rf a/fr

for CPa4

LLawyer

HChriste se

TPeebles

PDR?

ATE

08/ 791/94

08/

/94

08/ 1,

94

A8/

/94

08/

/94

Yes

No COPY?

Yes

No

Yes

Yes

No

e

No

Yes

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\LA\\ROB\\300RPT.RFA