ML14181A797

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/95-30 on 951116-1231 & Nov. Violation of Concern Because Corrective Actions to Address Sensing Line Configuration Problems W/Safety Injection Accumulator Level Transmitters Not Effective
ML14181A797
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/26/1996
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hinnant C
CAROLINA POWER & LIGHT CO.
Shared Package
ML14181A798 List:
References
NUDOCS 9602120096
Download: ML14181A797 (5)


See also: IR 05000261/1995030

Text

CATEGORY 2

,

-q

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'CCE9%ION NBR:9602120096

DOC.DATE: 96/01/26 NOTARIZED: NO

DOCKET #

'ACIL:50-261 H.B. Robinson Plant, Unit 2,

Carolina Power & Light C

05000261

AUTH.NAME

AUTHOR AFFILIATION

SHYMLOCK,M.B.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

HINNANT,C.S.

Carolina Power & Light Co.

SUBJECT: Forwards insp rept 50-261/95-30 on 951116-1231 & NOV.

Violation of concern because corrective actions to address

sensing line configuration problems w/safety injection

accumulator level transmitters not effective.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR I

ENCL

SIZE:

"

"d

T

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

MOZAFARI,B

1

1

INTERNAL: AEOD/DEIB

1

1

AEOD/SPD/RAB

1

1

AEODTTC

1

1

DEDRO

1

1

1

1

NRR/DISP/PIPB

1

1

RR1

1

NRR/DRPM/PECB

1

1

NRR/DRPM/PERB

1

1

NUDOCS-ABSTRACT

1

1

OE DIR

1

1

OGC/HDS3

1

1

RGN2

FILE

01

1

.1

EXTERNAL: LITCO BRYCE,J H

1

1

NOAC

1

1

NRC PDR

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTATL NUMBER OF COPIES REOUIRED: LTTR

18

ENCL

18

January 26, 1996

Carolina Power & Light Company

ATTN:

Mr. C. S. Hinnant

Vice President

H. B. Robinson Steam Electric Plant

Unit 2

3581 West Entrance Road

Hartsville, SC 29550

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/95-30 AND NOTICE OF VIOLATION

Dear Mr. Hinnant:

This refers to the inspection conducted on November 26 - December 31, 1995,

for the H. B. Robinson facility. The purpose of the inspection was to

determine whether activities authorized by the license were conducted safely

and in accordance with NRC requirements. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations of

activities in progress.

Based on the results of this inspection, the NRC has determined that a

violation of NRC requirements occurred. The violation is cited in the

enclosed Notice of Violation (Notice) and the circumstances surrounding it are

described in detail in the subject inspection report.

The violation is of

concern because corrective actions to address sensing line configuration

problems associated with the Safety Injection Accumulator level transmitters,

as well as other safety-related instrumentation, has not been fully effective.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. Your response may reference or

include previous docketed correspondence, if the correspondence adequately

addresses the required response. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, its enclosures, and your response will be placed in the NRC

Public Document Room (POR).

To the extent possible, your response should not

include any personal privacy, proprietary, or safeguards information so that

it can be place in the PDR without redaction.

960212009?6 960126

PDR ADOCK 05000261

G

PDR

CP&L

2

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.95-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by M. Shymlock)

Milton B. Shymlock, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket No.: 50-261

License No.: DPR-23

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

Dale E. Young

Plant Manager

H. B. Robinson Steam Electric Plant

3581 West Entrance Road

Hartsville, SC 29550

J. Cowan, Manager

Operations & Environmental

Support

MS 0HS7

Carolina Power & Light Company

P. 0. Box 1551

Raleigh, NC 27602

R. M. Krich, Manager

Regulatory Affairs

H. B. Robinson Steam Electric Plant

3581 West Entrance Road

Hartsville, SC 29550

Max Batavia, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

(cc w/encls cont'd - See page 3)

CP&L

3

(cc w/encl cont'd)

Public Service Commission

Dayne H. Brown, Director

State of South Carolina

Division of Radiation Protection

P. 0. Box 11649

N. C. Department of Environmental

Columbia, SC

29211

Commerce & Natural Resources

P. 0. Box 27687

Hartsville Memorial Library

Raleigh, NC

27611-7687

147 W. College Avenue

Hartsville, SC

29550

R. E. Jones

General Counsel - Legal Department

Distribution w/encl:

Carolina Power & Light Co.

M. Shymlock, Ru

P. 0. Box 1551

B. Mozafari, NRR

Raleigh, NC 27602

G. A. Hallstrom, Ru

PUBLIC

Karen E. Long

Assistant Attorney General

NRC Resident Inspector

State of North Carolina

U. S. Nuclear Regulatory Comission

P. 0. Box 629

2112 Old Camden Road

Raleigh, NC 27602

Hartsville, SC

29550

Robert P. Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

1SEE

PREVIOUS CONCURRENCE

.CATTACoe

SEND TO PUBLIC DOCUMENT

ROOM?

0P

OFFICE

RIR:DRP

RII:IRP

nlloDRP

r

SIG NATURE 7 7

K

NAME

GWiseman

Orders

JZelUr

J.clea

rowloy

C

DATE 1

01 /60/ 96

O1/1- /96

01/

/96

01 X/96

Ol/ tI96

01/

/9o]

COPY?

-Y

NO

YES

NO

YES

NO

J

2 ENO

CE

NO

YES__NO

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\ROBINSON\\IRCURR\\IR9530

OFIERIDPR0DR

I:R

H

CP&L

atii 1MrOiibYy

ledPublic

Service Commission

(cwencront DirectorState of South Carolina

Dayne H. Brown. Director

-P.

0. Box 11649

Division of Radiation Protection

0.

SC

1164

1

N. C. Department of Envi onmental

Columbia, SC 29211

Commerce & Natural Resources

Hartsville Memorial Libeiry

P. 0. Box 27687

Raleigh, NC

27611-7687

Hartsville. SC 29 50

R. E. Jones

Distribution wlepc1

General Counsel - Legal epartmt

Carolina Power & Light CO.

M. Shymlock/RI

P. 0. Box 1551

B. MozAfar

m.

NRR

Raleigh. NC 27602

GU A Halstrom. Ru

PtJBLI

Karen E. Long

Assistant Attorney General

NR Resident Inspector

State of North Carolina

21S. Nuclear Regulatory CoadiSSi

P. 0 Box6292112

Old Camden Road

P. 0. Box 629

Hrsil.S

95

Raleigh, NC 27602

Hartsville. SC 29550

Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh. NC 27626-0520

SEICTCP-

nCOwUME IS

tic

OFFICI

a11 CRP

Rh CAP

RU DPP

T o 011 L I 9

1

/96

1 "/

7v

9

1

9

1

9

S IGNATURE 10R1-0

NAME Wism!n-

WOrders

il!r

JOQ

rwe

SO

FROM NRC SR'I,ROBINSON

01/26/96 18:09

P.

TOT L P.1