ML14181A750
| ML14181A750 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/10/1995 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hinnant C Carolina Power & Light Co |
| Shared Package | |
| ML14181A751 | List: |
| References | |
| NUDOCS 9508230052 | |
| Download: ML14181A750 (3) | |
See also: IR 05000261/1995021
Text
August 10, 1995
Carolina Power & Light Company
ATTN: Mr. C. S. Hinnant
Vice President
H. B. Robinson Steam Electric Plant,
Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/95-21 AND NOTICE OF VIOLATION
Dear Mr. Hinnant:
This refers to the inspection conducted on June 18 - July 15, 1995, for the
H. B. Robinson facility. The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, the NRC has determined that
violations of NRC requirements occurred. The violations are cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding them
are described in detail in the subject inspection report.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. Your response may reference or
include previous docketed correspondence, if the correspondence adequately
addresses the required response. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of.Practice," a copy of
this letter, its enclosures and your response will be placed in the NRC Public
Document Room (PDR).
To the extent possible, your response should not include
any personal privacy, proprietary, or safeguards information so that it can be
place in the PDR without redaction.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9508230052 950810
PDR ADOCK 05000261
Gk
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Davi M. Verr lli, Chief
Reac or Projects Branch 1A
Division of Reactor Projects
Docket No.:
50-261
License No.:
Enclosures: 1. Notice of Violation
2. NRC Inspection Report
cc w/encls:
Dale E. Young
Plant Manager
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551 - Mail 0HS7
Raleigh, NC 27602
R. M. Krich, Manager
Regulatory Affairs
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
(cc w/encls cont'd - See page 3)
3
(cc w/encls cont'd)
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
R. E. Jones
General Counsel - Legal Department
Carolina Power & Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC
27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC
29211
Hartsville Memorial Library
147 W. College Avenue
Hartsville, SC 29550
Distribution w/encls:
D. Verrelli, RII
B. Mozafari, NRR
G. A. Hallstrom, RH
PUBLIC
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
2112 Old Camden Road
Hartsville, SC 29550
SEND TO PUBLIC DOCUMENT ROQIVID
YES
NO
OFFICE
RII:DRP
RII:DRY
RII_
_
RI:DRS
RII:DRS
SIGNATURE
-)f
NAME
arefos:tj
COgle
Orars
CRapp
T eebles
DATE
08/
/95
08/
/95
08/10/95
0/
10/j495
08
/95
COPY?
YES
NO
YES
NO
YES
NO
)
NO
YES
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME:
P:\\IR95-21.HBR-
_