June 28, 1996
Carolina Power & Light Company
ATTN: Mr. C. S. Hinnant
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
FINAL INTEGRATED PERFORMANCE ASSESSMENT REPORT FOR H. B. ROBINSON
STEAM ELECTRIC PLANT (NRC INSPECTION REPORT NO. 50-261/96-07)
Dear Mr. Hinnant:
This letter, and the enclosed report, provide the results of the Integrated
Performance Assessment of the H. B. Robinson Steam Electric Plant, Unit 2.
Phase I of this assessment was a review of docketed.material performed in the
Region II Office between May 6 and May 17, 1996. The results of Phase I were
provided to you in Inspection Report 50-261/96-06 dated May 17, 1996.
Phase II of the assessment was conducted on-site between June 3 and June 14,
1996. Throughout the assessment the team did not identify any inoperable
safety system or equipment. The enclosed report provides an integrated
assessment and inspection recommendations based on the docket review and
information from the on-site inspection.
Overall, the team found performance in the areas of operations, maintenance,
and engineering to be good. Performance in the plant support and safety
assessment areas were excellent. The area of security was found to be
adequate with increased inspection recommended. A summary of our recommended
inspection efforts associated with each of these areas is provided in the
Performance Assessment/Inspection Planning Tree which is appended to the
inspection report.
No written response to this letter is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Sincerely, Original signed by:
Johns P. Jaixlon
CIA- 43
Johns P. Jaudon, Acting Deputy Director
Division of Reactor Projects
Docket No.:
50-261
O
License No.:
Enclosure:
(See page 2)
9607110196 9606286
PDR ADOCK 05000261
J
2
Enclosure:
Final Assessment
cc w/encl:
Dale E. Young
Plant Manager
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
J. Cowan, Manager
Operations & Environmental
Support MS OHS7
Carolina Power & Light Company
P. 0. Box 1551
Raleigh, NC 27602
R. M. Krich, Manager
Regulatory Affairs
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
W. D. Johnson, Vice President
and Senior Counsel
Carolina Power & Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
(cc w/encl cont'd - See page 2)
. CP&L
3
(cc w/encl cont'd)
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
Hartsville Memorial Library
147 W. College Avenue
Hartsville, SC 29550
Distribution w/encl:
M. Shymlock, RII
B. Mozafari, NRR
M. N. Miller, RH
G. A. Hallstrom, RH
PUBLIC
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
2112 Old Camden Road
Hartsville, SC 29550
SEND TO PUBLIC DOCUMENT ROOM?
(O
OFFICE
RII:DRS
RII:DRP
RII:DRS
RII:DRS
RI:DRS
RII:DRP/
SIGNATURE
NAME
PKel ggtj
es I
C
_
Wearden
Dhnso
DATE
06I/
06 ///
96
V/0196
/Q/96
1
06/296
06 /
/ 96
6
/ 9
COPY?
YES
(O N
YES
YES
NOI
YES
I YES
- S
OFFICIAL RECORD COPY
DOCUMENT NAME:
P:\\ROB9607.IPA
APPENPIX A
FINAL ROBINSON
PERFORMANCE ASSESSMENT/INSPECTION PLANNING TREE
ASSESSMENT OF
LICENSEE
PEAFORMANCE
N'OP'ERATIONSMANENCp
COARCTIE
SAFETY FOCUS
SAFETY FOCUS
SAFETY FOCUS
.
SAFETY FOCUS
10NTIFicATION
LR
- PROBLEM
PROBLEM
PROBLEM
IDENTIFICATF_[
AI
IDENTIICATION
IDENTIFICATION
ROBLEM
iPRQBLEMt
PROBLEM
PROBLEM
PREM
R
LUTION:
RSOLUTION
RESOLUTION
RESOLUTION
ANALYSSE
AND
QUALT
F
QUALITY OF
EQUIP RERF
OE-
IINEERI
MATL COND
PEAIONS-
.WORK.
QUALITY OF
oRAW.
PROGRAMS:
QUAUTY OF
- 'AND;:
AND: ::AINTENANCE
cu.S
.OCEDURS
WORK
REDUCED
INCREASED
PROGRAMS
PROG & PROC
IINS.PECTION
INSPECTION
PROCEDURESR
SC
MAINTAIN
INDETERMINATE-MORE
INSPECTION
[l
INSPECTION REQUIRED