Informs of Planned Insp Effort Resulting from Robinson Plant Performance Review & General Time Frame of Planned Insps Plus Exact Dates of Team Insps
ML14181A392
Person / Time
Site: Robinson 
Issue date: 11/17/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Keenan J
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9712040084
Download: ML14181A392 (6)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9712040084 DOC.DATE: 97/11/17 NOTARIZED: NO DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION SHYMLOCK,M.B.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION KEENAN,J.S.

Carolina Power & Light Co.

SUBJECT:

Informs of planned insp effort resulting from Robinson PPR review & general time frame of planned insps plus exact dates of team insps.

A DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

E RECIPIENT COPIES RECIPIENT COPIES G

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0

PD2-1 PD 1

1 TRIMBLE,D 1

1 INTERNAL: AEOD/SPD/RAB 1

1 1

1 DEDRO 1

1 ILE CENTE 1

1 NRR/DISP/PIPB 1

1 FB 1

1 NRR/DRPM/PECB 1

1 NRR/DRPM/PERB 1

1 NUDOCS-ABSTRACT 1

1 OE DIR 1

1 2

OGC/HDS3 1

1 RGN2 FILE 01 1

1 EXTERNAL: LITCO BRYCE,J H 1

1 NOAC 1

1 NRC PDR 1

1 NUDOCS FULLTEXT 1

1 0

C U

E N

T NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 18

November 17, 1997 Carolina Power & Light Company ATTN:

Mr. J. S. Keenan Vice President H. B. Robinson Steam Electric-Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - ROBINSON

Dear Mr. Keenan:

On October 17, 1997,-the NRC staff completed the semiannual Plant Performance Review (PPR) of Robinson Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Robinson involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 to October, 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Robinson PPR review and the general time frame of planned inspections plus the exact dates of team inspections. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six (6) months. Individual inspections are identified by the month(s) in which we intend to conduct the inspection. Exact dates are not provided for non-team inspections because experience has proven that we must often change dates as the result of higher priority requirements and conflicts at your site or other sites. You will be contacted 3-6 weeks prior to individual inspections to confirm dates. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

The NRC's general policy for reactor inspections is that each inspection shall be announced, except when announcing the inspection could reasonably compromise the objectives of the inspectors. Therefore, some specific inspections, such as in the security and radiological protection areas, may not be announced.

As part of the regional initiative inspection program, we plan to conduct followup inspections of fire barrier penetration seal issues during the next 6 months. The issues are discussed in Information Notice (IN) 88-04, "Inadequate Qualification and Documentation of Fire Barrier Penetration 9712040094 971117 PDR ADOCK 05000261 0

PDR 4

4 6

CP&L 2

Seals." and IN 88-56, "Potential Problems with Silicone Foam Fire Barrier Penetration Seals." The specific plants that will be inspected have not yet been determined. We will notify you separately if the inspections are scheduled at your facility in the next 6 months.

We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-562-4540.

Sincerely, Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 License No. DPR-23

Enclosure:

Inspection Plan cc w/encl:

Dale E. Young Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 J. W. Moyer Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 (cc w/encl cont'd - See page 3)

CP&L 3

(cc w/enc] cont'd)

Robert P. Gruber D. B. Alexander, Manager Executive Director Performance Evaluation and Public Staff -

NCUC Regulatory Affairs OHS7 P. 0. Box 29520 Carolina Power & Light Company Raleigh, NC 27626-0520 412 S. Wilmington Street Raleigh, NC 27601 Public Service Commission State of South Carolina H. K. Chernoff, Supervisor P. 0. Box 11649 Licensing/Regulatory Programs Columbia, SC 29211 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Hartsville Memorial Library 3581 West Entrance Road 147 W. College Avenue Hartsville, SC 29550 Hartsville, SC 29550 T. M. Wilkerson, Manager Distribution w/encl:

(See page 4)

Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Mel Fry. Acting Director Division of Radiation Protection N. C. Department of Environment, Health & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Co.

P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602

CP&L 4

Distribution w/encl:

M. Shymlock, RII B. Mozafari, NRR J. Coley, RII R. Baldwin, RII J. Lenahan, RII W. Rankin, RII D. Thompson, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 2112 West Old Camden Road Hartsville, SC 29550 OFFICE RIT DRP RJI DRS R 4 RI ODRS RIT DRS RI DRS SIGNATURE 7

NAME JJohns l

HCh stensen PFr on T2eb es DATE 11 97 11 /

/ 97 1..

97 1j.

/ 97 11 t7 97 11

/ 97 COPY?

YES NO YS O

NO YE NO NO YES NO YES NO OFFICE RII DRP SIGNATURE NAME FJape DATE 11 / / t / 97 11 /

/ 97 11/

/ 97 11

/

/97 11/

/ 97 11 /

/ 97 COPY?

(YS NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENt NAME:

G:\\ROBINSO \\PPR\\4097\\PPRLlR.ROB

ROBINSON INSPECTION PLAN FOR: 10/97 - 3/98 IP - Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE/

NUMBER OF PLANNED TYPE OF INSPECTION PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES IP 37550 Engineering - MOV 1

10/97 Safety Issue Followup Inspection Inspection Compileted IP 62707 Maintenance 1

10/97 Initiative Inspection Review On-Line Maintenance of EDGs Compl eted IP 62706 Maintenance Rule 5

11/97 Initiative Team Inspection Inspection Completed IP 82301 Emergency Preparedness 4

11/17/97 core Inspection IP 93903 Engineering 2

1/98 Core Inspection -

Perform Followup of A/E Team Inspecti on IP 62700 Maintenance 1

1/98, 2/98 Initiative Inspection Review Surveillance Procedures for new Improved0 Technical Specifications IP 81700 Security 1

1/98 Core Inspection IP 71001 Operations 1

2/98 Core Inspection Requal Exam IP 37550 Engineering 1

2/98, 3/98 Core Inspection TI 2515/109 Engineering 1

2/98 Safety Issue MOV GL89-10 Closure Inspection IP 83750 Radiation Protection 1

2/98 Core Inspection IP 84750 IP_86750 file g:\\robi nson\\ppr\\4q97\\i nspnitx. robENLSR