ML14181A195
| ML14181A195 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/04/1994 |
| From: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hinnant C CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 9403150119 | |
| Download: ML14181A195 (11) | |
Text
I MAR -4 1994 Docket No.:
50-261 License No.:
DPR-23 Carolina Power and Light Company ATTN:
Mr. C. S. Hinnant Vice President H. B. Robinson Steam Electric Plant Unit 2 P. 0. Box 790 Hartsville, SC 29550-0790 Gentlemen:
SUBJECT:
MEETING
SUMMARY
ROBINSON SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE This refers to the management meeting conducted at the H. B. Robinson Media Center on February 18, 1994. The purpose of the meeting was for the Nuclear Regulatory Commission to present the Systematic Assessment of Licensee Performance of the H. B. Robinson facility which assesses the period from June 28, 1992 through December 25, 1993. A list of attendees and a copy of our slides are enclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclo sures will be placed in the NRC Public Document Room.
Should you have any questions concerning this matter, please contact us.
Sincerely, Jon R. Johnson, Acting Director Division of Reactor Projects
Enclosures:
- 1. List of Attendees
- 2. SALP Slides cc w/encls:
(See page 2) 9403150119 940304 PDR ADOCK 05000261 PDR
MAR - 4 1994 Carolina Power and Light Company 2
cc w/encls:
M. P. Pearson Public Service Commission Plant Manager State of South Carolina H. B. Robinson Steam Electric Plant P. 0. Box 11649 P. 0. Box 790 Columbia, SC 29211 Hartsville, SC 29550 H. W. Habermeyer, Jr.
Vice President Nuclear Services Department Carolina Power & Light Company P. 0. Box 1551 - Mail OHS7 Raleigh, NC 27602 R. Krich, Manager Regulatory Compliance H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, Commerce & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 H. Ray Starling Manager - Legal Department Carolina Power and Light Co.
P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 bcc w/encls:
(See page 3)
MAR -4 1994 Carolina Power and Light Company 3
bcc w/encls:
H. Christensen, RH B. Mozafari, NRR Document Control Desk NRC Resident Inspector U. S. Nuclear Regulatory Commission Route 5, Box 413 Hartsville, SC 29550 RII:DRP RI DRP/
RI P
JStarefo :tj HCh istensen DVerrelli 03/ /94 03/D/94 03/3 /94
ENCLOSURE 1 List of Attendees Licensee Attendees:
S. Smith, Chairman and Chief Executive Officer W. Cavanaugh, President and Chief Operating Officer W. Orser, Executive Vice President, Nuclear Generation R. Anderson, Vice President, Brunswick Site W. Robinson, Vice President, Harris Site C. Hinnant, Vice President, Robinson C. Dietz, Vice President, Special Projects Nuclear Regulatory Commission:
S. D. Ebneter, Regional Administrator, Region II (RH)
A. F. Gibson, Director, Division of Reactor Safety, RII S. S. Bajwa, Acting Director, Project Directorate II-1, Office of Nuclear Reactor Regulation (NRR)
D. M Verrelli, Chief, Reactor Projects Branch 1, Division of Reactor Projects (DRP), RH W. T. Orders, Senior Resident Inspector - Robinson, DRP, RH K. M. Clark, Public Affairs Officer, Office of the Administrator, RH R. Trojanowski, Regional State Liaison Officer, RH B. Mozafari, Project Manager, NRR
ENCLOSURE 2 UNITED STATES NUCLEAR REGULATORY COMMISSION ROBINSON NUCLEAR PLANT June 28, 1992 through December 25, 1993 SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)
MEETING February 18, 1994
NEW SALP PROCESS
- Resident Program.
Inspection Region Based Inspection SALP REGIONAL Licensing B
RADMINISTRATOR,
SALP BOARD Special Initiatives Event Reviews MIP
ROBINSON NUCLEAR PLANT SALP RATING
SUMMARY
FUNCTIONAL RATING RATING AREA LAST PERIOD THIS PERIOD PLANT OPERATIONS 1
2 MAINTENANCE 2
3 ENGINEERING 2
2 PLANT SUPPORT N/A 2
EMERGENCY 2 (improving)
PREPAREDNESS RADIOLOGICAL 1
CONTROLS SECURITY 1 (declining)
SAFETY ASSESSMENT/
2 QUALITY VERIFICATION
PLANT OPERATIONS CATEGORY 2
- STRENGTHS Response to Events Routine Operations Operator Knowledge
- CHALLENGES Startup Performance Control Room Discipline Management Oversight
MAINTENANCE CATEGORY 3
- STRENGTHS Plant Performance Improvement Initiatives
- CHALLENGES Procedural Controls Management Oversight Corrective Action
ENGINEERING CATEGORY 2
- STRENGTHS Staff Qualifications Modification Packages Erosion/Corrosion Programs
- CHALLENGES Site/Corporate Interface Service Water Heat Exchanger Evaluations Refueling Support
PLANT SUPPORT CATEGORY 2
- STRENGTHS ALARA Program Contamination Control Effluent Control Waste Management Emergency Preparedness
- CHALLENGES Procedural Controls Corrective Action