November 7, 1996 Carolina Power & Light Company ATTN: Mr. C. S. Hinnant Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) -
ROBINSON 50-261
Dear Mr. Hinnant:
On October 3, 1996. the NRC staff completed the semiannual Plant Performance Review (PPR) of H. B. Robinson Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection resources.
The PPR for Robinson involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March, 1996 to September, 1996.
PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Robinson PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature, nor are region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.
During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments.
Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.
The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.
9611150331 961107 PDR ADOCK 05000261 PDR
CP&L 2
We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-331-5535.
Milton B. Shyalock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-261 License Nos. DPR-23
Enclosure:
Inspection Plan cc w/encl:
Dale E. Young Plant Manager H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29551-0790 J. Cowan, Manager Operations & Environmental Support MS OHS7 Carolina Power & Light Company P. 0. Box 1551 Raleigh, NC 27602 R. M. Krich, Manager Regulatory Affairs H. B. Robinson Steam Electric Plant 3581 West Entrance Road.
Hartsville, SC 29551-0790 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 (cc w/encl cont'd - See page 3)
CP&L 3
(cc w/encl cont'd)
W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Co.
P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. 0. Box 11649 Columbia, SC 29211 Hartsville Memorial Library 147 W. College Avenue Hartsville, SC 29551-0790 Distribution w/encl:
(See page 4)
CP&L 4
Distribution w/encl:
M. Shymlock. RII B. Mozafari, NRR M. N. Miller, RII R. Aiello, RH G. A. Hallstrom, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 2112 Old Camden Road Hartsville, SC 29551-0790 OFFICE R -0RS RTI RS RIIDRS RI I -pRS RI. DRS RTI-0 RS SIGNATURE NAME ar CCast CChr tensen PFrederickson TPee 1es AGibon 1 II DATE 11 /
/96 11
//
96 l
6/k 9111 96 COPY?
( E NO ES/
NO YE NO NO ES 0
-RIIDRP SIGNATURE FJ NAME F f fe 1rer Jjoh SEbnet DATE 11
/
/ 96/
96 11/
96 11 9696 11/
96 COPY?
YES NO YES NO ES ES NO YES NO YES NO OFI-CAL RnC D nmPY DOCUMENT NAME-G\\RORINSON R
PPR.L-R
ROBINSON INSPECTION PLAN IP Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/
NUMBER OF PLANNED TYPE OF INSPECTION PROGRAM AREA INSPECTORS INSPECTION DATES COMMENTS IP 71707 Control Room/Plant Observation 1
12/2-6/96 Initiative Inspection IP 71001 Operator Training and 1
1/20-24/97 Core Inspection Qualification TI 2515/109 MOV Generic Letter 89-10 1
11/4-8/96 Initiative Inspection Followup IP 62700 Maintenance Implementation and 1
10/28-11/1/96 Initiative Inspection Safety Issues FME Controls IP 73753 In Service Inspection 1
10/28-11/1/96 Core Inspection IP 62706 Maintenance Rule Inspection 5
3/17-21/97 Initiative Inspection IP 37550 Engineering Inspection 1
11/18-22/96 Core Inspection IP 83750 Occupational Radiation Exposure 1
10/7-11/96 Core Inspection IP 84750/
Radwaste Treatment, Effluent, 1
Second Quarter Initiative Inspection IP 86750/
and Monitoring 1997 TI 2515/133 IP 81700 Security Program 1
11/4-8/96 Core Inspection 3/17-21/97 IP 81700 Security -
Access Authorization 1
11/18-22/96 Initiative Inspection Corporate and all Nuclear Sites IP 64704 Fire Protection 2
10/21-25/96 Core Inspection IP 82701 Emergency Preparedness 1
11/18-22/96 Core Inspection IP 93801 Architect/Engineer 7
April/May 1997 Initiative Inspection-Safety Issues IP 40500 Evaluation of Licensee 3
12/2-6/96 Core Inspection Self-Assessment ENCLOSURE