April 5, 1996 Carolina Power & Light Company ATTN: Mr. C. S. Hinnant Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) -
ROBINSON
Dear Mr. Hinnant:
On February 29, 1996, the NRC staff completed the semiannual Plant Performance Review (PPR) of H. B. Robinson Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Robinson involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1995 to February 1996. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Robinson PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.
9604230370 960405 PDR ADOCK 05000261 2
0PDR 220035
CP&L 2
We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-331-5535.
Original signed by M. Shymlock Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-261 License Nos. DPR-23
Enclosure:
Inspection Plan cc w/encl:
Dale E. Young Plant Manager H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 J. Cowan, Manager Operations & Environmental Support MS OHS7 Carolina Power & Light Company P. 0. Box 1551 Raleigh, NC 27602 R. M. Krich, Manager Regulatory Affairs H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 cc w/encl: See page 3
CP&L 3
cc w/encl continued:
W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Co.
P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. 0. Box 11649 Columbia, SC 29211 Hartsville Memorial Library 147 W. College Avenue Hartsville, SC 29550 Distribution w/encl:
B. Mozafari, NRR G. Hallstrom, RH J. Blake, RH J. Lenahan, RH W. Rankin, RH D. Thompson, RH R. Aiello, RH PUBLIC NRC Resident.Inspector U. S. Nuclear Regulatory CommissioWe 2112 Old Camden Road Hartsville, SC 29550 SEND TO PUBLIC DOzET OM YES NO OFFICE RH:
RII:DRS RII:DRS S
IRS SIGNATURE 7 79 NAME AGib CCh rstensen Pble K
PFredrickson DATE 03/ 1 96 3
190 03/
/96 03
/96 3
6 03/ 6/96 COPY?
M NO ES NO I
S)
NO ES NO YES NO E
NO OFFICIAL RECORD COPY ENT NAME I.\\ROB\\PPR.LTR
ROBINSON INSPECTION PLAN IP -
Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/
NUMBER OF PLANNED TYPE OF INSPECTION PROGRAM AREA INSPECTORS INSPECTION DATES COMMENTS IP 62703 Maintenance Observation 1
3/25-29/96 Core Inspection IP 37550 Engineering Effe tiveness 3
5/13-17/96 Core Inspection TI 2515/118 Service Water 1
5/13-17/96 Safety Issue IP 71091 Operator Requalification 1
5/20-24/96 Core Inspection IP 62703 Maintenance Observation 1
5/20-24/96 Core Inspection IP 93808 Integrated Performance 1
6/3-14/96 Initiative Assessment (IPAP)
IP 83724 Rad Protection Practices 1
7/8-10/96 Initiative-Rad practices,procedural compliance, dose info, mtg changes.
IP 62700 Equipment Reliaflity 1
7/8-12/96 Initiative-focus on I&C equipment failure and root cause.
TI 2515/132 Vehicle Barrier System 2
7/22-24/96 Safety Issue IP 62700 Equipment Reliayility 1
7/29-8/2/96 Initiative-focus on I&C equipment failure and root cause.
Initial Operator Exam prep 3
8/5-9/96 Core Inspection IP 37550 Engineering 3
8/5-9/96 Core Inspection Initial Operator Exams 3
8/19-23/96 Core Inspection 1
ENCLOSURE
ROBINSON INSPECTION PLAN IP -
Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/
NUMBER OF PLANNED TYPE OF INSPECTION PROGRAM AREA INSPECTORS INSPECTION DATES COMMENTS IP 62703 Maintenance Observation 1
3/25-29/96 Core Inspection IP 37550 Engineering Effectiveness 3
5/13-17/96 Core Inspection TI 2515/118 Service Water 1
5/13-17/96 Safety Issue IP 71001 Operator Requalification 1
5/20-24/96 Core Inspection IP 62703 Maintenance Observation 1
5/20-24/96 Core Inspection IP 93808 Integrated Performance 1
6/3-14/96 Initiative Assessment (IPAP)
IP 83724 Rad Protection Practices 1
7/8-10/96 Initiative-Rad practices,procedural compliance, dose info, mt9 changes.
IP 62700 Equipment Reliability 1
7/8-12/96 Initiative-focus on I&C equipment failure and root cause.
TI 2515/132 Vehicle Barrier System 2
7/22-24/96 Safety Issue IP 62700 Equipment Reliability 1
7/29-8/2/96 Initiative-focus on I&C equipment failure and root cause.
Initial Operator Exam prep 3
8/5-9/96 Core Inspection IP 37550 Engineering 3
8/5-9/96 Core Inspection Initial Operator Exams 3
8/19-23/96 Core Inspection 1
ENCLOSURE
IP 62703 Maintenance Observation 1
9/9-13/96 Core Inspection IP 84750 Radiation Protei on 1
9/16-20/96 Core Inspection IP 86750 TI 2515/127 Access Control 1
9/23-25/96 Safety Issue IP 71715 Control Room/Plant Observation 1
9/23-27/96 Initiative - Operator Procedure Interface IP 73753 Inservice Inspection;-
1 9/30-10/4 Core Inspection Observation 2