ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:9405170035
DOC.DATE: 94/05/09
NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
GIBSON,A.F.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
HINNANT,C.S.
Carolina Power & Light Co.
R
SUBJECT: Discusses insp rept 50-261/93-34 on 931120-1206 & forwards
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR _
ENCL
SIZE:
5'
D
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
A
PD2-1 PD
1
1
MOZAFARI,B
1
1
D
INTERNAL: AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1
D
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/DRIL/RPEB
1
1
S
NRR/DRSS/PEPB
1
1
NRR/PMAS/ILPB1
1
1
NRR/PMAS/ILPB2
1
1
NUDOCS-ABSTRACT
1
1
OLEDIR-
1
1
OGC/HDS2
1
1
G
ILE
02
1
1
RES/HFB
1
1
RGN2
FILE
01
1
1
E W
NAL: EG&G/BRYCE,J.H.
1
1
NRC PDR
1
1
1
1
R
I
D
S
A
D
D
NOTE TO ALL "RIDS" RECIPIENTS:
S
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM P1-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
22
ENCL
22
MAY
9 1994
Docket No. 50-261
License No. DPR-23
EA 94-024
Carolina Power and Light Company
ATTN:
Mr. C. S. Hinnant
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
P. 0. Box 790
Hartsville, SC 29550-0790
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/93-34)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
the Augmented Inspection Team during the period November 20 through
December 6, 1993. The inspection objectives included review of the scope and
causes of the events which were revealed during the November 1993 post
.refueling
startup of H. B. Robinson Steam Electric Plant, Unit 2. The report
documenting this inspection was sent to you by letter dated January 5, 1994.
As a result of this inspection, failures to comply with NRC regulatory
requirements were identified, and accordingly, NRC concerns relative to the
inspection findings were discussed during an enforcement conference held on
March 14, 1994, in the NRC Region II office, Atlanta, Georgia. The
Enforcement Conference Summary was sent to you on March 17, 1994.
The violations described in the enclosed Notice of Violation involved the
failure to establish and implement procedures for refueling operations and
plant startup and the failure to assure that purchased fuel conformed to
It appears that a lack of effective management control and oversight of your
refueling and startup activities was the major factor contributing to the
violations, as evidenced by the examples of inadequate or unimplemented
procedures. Also, quality assurance activities failed to identify the
deficiencies in nuclear fuel procurement. Additionally, your lack of specific
procedural requirements led to the failure of the operating crew to monitor
diverse instrumentation readings during the unit startup and subsequently led
them to exceed the Technical Specification limits for startup rate.
Therefore, please include in your response your corrective actions to assure
adequate monitoring of instruments during unit startup evolutions.
.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to take to prevent recurrence. After reviewing your response
9405170035 940509
PDR ADOCK 05000261
Carolina Power & Light Co.
2
to this Notice, including your proposed corrective actions and the results of
future inspections, the NRC will determine whether further NRC enforcement
action is necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by A. F. Gibson)
Albert F. Gibson, Director
Division of Reactor Safety
Enclosure:
.
cc w/encl:
M. P. Pearson, Plant Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551 - Mail 0HS7
Raleigh, NC 27602
R. Krich, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC
29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Envir. Control
2600 Bull Street
Columbia, SC
29201
cc w/encl cont'd:
(See page 3)
MAY
9 1994
Carolina Power & Light Co.
3
cc w/encl cont'd:
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC 27611-7687
H. Ray Starling
Manager -
Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC
27602
Robert P. Gruber, Executive Dir
Public Staff - NCUC
.P.
0.
Box 29520
Raleigh, NC
27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
bcc w/encl:
SECY
CA
JTaylor, EDO
JMilhoan, DEDR
SEbneter, RH
JLieberman, OE
JGoldberg, OGC
LReyes, NRR
WRussell, NRR
Enforcement Coordinators
RI, RH, RIII, RIV, RV
BHayes, 01
EJordan, AEOD
.DWilliams,
0IG
JBeall, OE
bcc w/encl cont'd:
(See page 4)
.
Carolina Power & Light Co.
4
MAY
9 1994
bcc w/encl cont'd:
EA File
TPeebles, RH
HChristensen, RII
DVerrelli, RII
RCarroll, RH
JStarefos, RH
BMozafari, NRR
KClark, RII
LWatson, RH
GHallstrom, RH
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC
29550
- For previous list of concurrences, see attached page.
SEND
OFC
RII:DRS
RII:DRP
RII:DRP
RII:EICS
RII:ORA
RII:DRS
TO
NAME
TPeebtes:tap/fr
HChristensen
JJohnson
BUryc
CEvans
AGibson
R?
DATE
/
/94
/
94
/
/94
/
/94
/
/94
511
/94
No COPY?
Yes
No
Yes
No
Yes
No Yes
No Yes
No] Yes
No
OFFICIAL RECORD COPY
DOCUMENT NAME:
G:\\REPORT\\ROB9334.TAP
Carolina Power & Light Co.
3
MAY
9 1994
cc w/encl cont'd:
H. Ray Starling
Manager -
Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
.
Columbia, SC 29211
bcc w/encl:
H. Christensen, RH
B. Mozafari, NRR
J. Lieberman, NRR
G. Hallstrom, DRS
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
SEND
OFC
RII:DRS
RI .DRP
RII
P
RII:E
RII:ORA
TO
NAME
TPeebles:tap/fr
Christense
JJ hnon
BU yc
CEvans
PDR?
DATE
/
C// 4/94
/94
/94
/94
Yes
No COPY?
Yes
Yes
No
Yes
No
Yes
No
Yes
No
S
END OFC
RII:DR_
__
_
_
__
__
_
TO
NAME
AGibson
SE D
LF I I_
_
_
_
__
_
_
_
_
/94
?
DATE
C
/
/94
/
/94
/
/94
/_/94
es
No-COPY?
Yes
Yes
No
Yes
No
Yes
No
Yes
No
OFFICIAL RECORD COPY
DOCUMENT NAME:
G:\\REPORT\\ROB9334.TAP