ML14178A459

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/94-04 on 940123-0225.No Violations or Deviations Noted.Four Unresolved Items Identified & Weaknesses in Command & Control Noted
ML14178A459
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/22/1994
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Hinnant C
Carolina Power & Light Co
Shared Package
ML14178A460 List:
References
NUDOCS 9404110128
Download: ML14178A459 (3)


See also: IR 05000261/1994004

Text

2vAi

2

194

Docket No.:

50-261

License No.: DPR-23

Carolina Power and Light Company

ATTN:

Mr. C. S. Hinnant

Vice President

H. B. Robinson Steam

Electric Plant, Unit 2

P. 0. Box 790

Hartsville, SC 29550-0790

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/94-04

This refers to the inspection conducted by W. T. Orders of this office on

January 23 - February 25, 1994. The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, there were no violations or deviations

identified. This report identifies four unresolved items. Additionally, the

unit restart of February 8, 1994, was conducted in a professional manner;

however, the unit shutdown on February 17, 1994, identifies continued

weaknesses in command and control.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

DAVID l. VEREL

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

.

Enclosure:

NRC Inspection Report

cc w/encl:

(See page 2)

9404110128 940322

PDR

ADOCK 05000261

Q

PDR

MAR 2 2 1994

Carolina Power and Light Company

2

cc w/encl:

M. P. Pearson

Robert P. Gruber

Plant Manager

Executive Director

H. B. Robinson Steam Electric Plant

Public Staff - NCUC

P. 0. Box 790

P. 0. Box 29520

Hartsville, SC 29550

Raleigh, NC

27626-0520

H. W. Habermeyer, Jr.

Public Service Commission

Vice President

State of South Carolina

Nuclear Services Department

P. 0. Box 11649

Carolina Power & Light Company

Columbia, SC 29211

P. 0. Box 1551

- Mail 0HS7

Raleigh, NC 27602

R. Krich, Manager

Regulatory Compliance

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Max Batavia, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

.2600

Bull Street

Columbia,

SC

29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Commerce & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

H. Ray Starling

Manager -

Legal Department

Carolina Power and Light Co.

P. 0. Box 1551

Raleigh, NC 27602

Karen E. Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC

27602

bcc w/encl:

(See page 3)

Carolina Power and Light Company

3MA

Z2 1994

bcc w/encl:

H. Christensen, RH

B. Mozafari, NRR

Document Control Desk

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

RI:P,

RIpP

t

os:tj

HChri tensen

03

94

03/1

94