ML14178A357
| ML14178A357 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/23/1993 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Dietz C Carolina Power & Light Co |
| Shared Package | |
| ML14178A358 | List: |
| References | |
| NUDOCS 9308050064 | |
| Download: ML14178A357 (4) | |
See also: IR 05000261/1993015
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9308050064
DOC.DATE: 93/07/23
NOTARIZED: NO
DOCKET #
ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
ERRELLI,D.M.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
DIETZ,C.R.
Carolina Power & Light Co.
SUBJECT: Forwards insp rept 50-261/93-15 on 930612-0709.Weaknesses in
calibration of heat trace recorder & calibration errors,
I
noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:
+
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
MOZAFARI,B
1
1
INTERNAL: AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1
[
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/DRIL/RPEB
1
1
NRR/DRSS/PEPB
1
1
NRR/PMAS/ILPB1
1
1
NRR/PMAS/ILPB2
1
1
NUDOCS-ABSTRACT
1
1
OE DIR
1
1
OGC/HDS2
1
1
W
mTE9
02
1
1
RES/HFB
1
1
RGN2
FILE
01
1
1
EXTERNAL: EG&G/BRYCE,J.H.
1
1
NRC PDR
1
1
C
1
1
C
NOTE TO ALL *RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
22
ENCL
22
JUL 23
993
Docket No.:
50-261
License No.:
Carolina Power and Light Company
ATTN: Mr. C. R. Dietz
Vice President
H. B. Robinson Steam Electric Plant,
Unit 2
P. 0. Box 790
Hartsville, SC 29550-0790
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/93-15
This refers to the inspection conducted by W. T. Orders of this office on
June 12 - July 9, 1993. The inspection included a review of activities
authorized for your H. B. Robinson facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, there were no violations or deviations
identified. However, the enclosed report documents weaknesses in the
calibration of a heat trace recorder and calibration errors introduced in the
Boric Acid Storage Tank temperature controller from a mis-positioned adjusting
link. These observations are of concern, in as much, as they are similar to
problems with calibration and control of instrumentation and control equipment
discussed in Inspection Reports 92-27, 92-34, and 93-11. Collectively, these
observations could be indicative of a programmatic deficiency warranting your
increased attention.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
9308050064 930723
ADOCK 05000261
G
JUL 23 1993
Carolina Power and Light Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGN
By
DAVID M. VERRELLI
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/encl:
W. T. Flanagan
Plant General Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Mr. W. S. Orser
Executive Vice President
Nuclear Generation
Carolina Power & Light Company
P. O. Box 1551 Mail Code - CPB 12
Raleigh, NC 27602
Mr. H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551
- Mail 0HS7
Raleigh, NC 27602
Heyward G. Shealy, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
.
(cc w/encl cont'd - See page 3)
Carolina Power and Light Company
3
(cc w/encl cont'd)
McCuen Morrell, Chairman
Darlington County Board of Supervisor
County Courthouse
Darlington, SC 29535
H. Ray Starling
Vice President - Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
J. L. Harrison, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Ms. Gayle B. Nichols
Staff Counsel
SC Public Service Commission
P. 0. Box 11649
Columbia, SC
29211
bcc w/encl:
H. Christensen, RII
B. Mozafari, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
RII:DRP
HCh s sen:tj
07h1/93