October 4, 1991
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/89-201)
This refers to the inspection conducted by J. Jacobson of this office on
June 10-14, .1991.
The inspection included a review of activities authorized
for your Robinson facility. At the conclusion of the inspection,.the findings
were.di.scussed with those members of your staff identified in the report.
Areas examined during the inspection are identified in the report* issued to
you
oh July 25,
1991.
Within these areas, the inspec'tion consisted of
selective examinations of procedures and representative records,
interviews
with personnel,' and observation of activities in progress.
Based on the results of this inspection, certain of your activities appeared to
be in violation *of NRC requirements.
The violation described in the enclosed
Notice (or the -- first, second, etc, -- violation described in the enclosed
Notice) is similar to a violation contained in the Notice sent to you by our
letter dated September 22,
1989.
Recurring violations are of particular
concern because the NRC expects licensees to learn from their past failures
and to take effective corrective actions.' Although NRC does not normally
consider monetary civil penalties for Severity Level
IV violations, the
Enforcement Policy states that such penalties may be imposed for Severity
Level IV violations that are similar to previous violations for which the
licensee did not take effective corrective action.
In this case,
we have
decided not to hold an enforcement conferences not to propose' a civil penalty
because after this issue was brought to your attention,
the valve was
demonstrated to be operable. The documentation or engineering evaluation was
found to be lacking.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and .any additional
actions you plan to prevent recurrence. After reviewing your response to th.is
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
9110290262 911004
PDR ADOCK 05000261
0
iCarolina
Power and Light Company
2
October 4, 1991
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by
Stuart Rubin/for
Albert F. Gibson, Director
Division of Reactor Safety
Enc osure:
cc w/encl
.
C. R.
Dietz, Manager
Robinson Nuclear Project Department
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC
29550
R. H. Chambers, Plant General Manager
H. B. Robinson Steam Electric PlaRt
P. 0. Box 790
Hartsville, SC
29550
Heyward G. Shealy, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC 27611-7687
McCuen Morrell, Chairman
Darlington County Board of Supervisors
County Courthouse
Darlington, SC 29535
(cc w/encl cont'd -
see page 3)
Carolina Power and Light Company
3
October 4, 1991.
(cc w/encl cont'd)
Mr. H. Ray Starling
Manager -
Legal Department
P. 0. Box 1551
Raleigh, NC
27602
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert Gruber
Executive Director
Public Staff -
NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
J. D. Kloosterman, Director
Regulatory Compliance
H. B. Robinson Steam
Electric Plant
P. 0. Box 790
Hartsville, SC
29550
bcc w/encl:
Document Control Desk
H. Christensen, RH
R. Lo, NRR.
B. K. Grimes, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC
29550
- FOR PREVIOUS CONCURRENCES -
SEE ATTACHED COPY
RII:DRS
+F RHI
S
RII:DRS
FRII:DRP
RII:E
F* p :er
C2(i an
AGib
EMerschoff
s
10/
9
/91
10/4/91
10/
/91
10
91
39
Carolina Power and Light Company
3
October 4, 1991
(cc w/encl cont'd)
Mr. H. -Ray Starling
Manager - Legal Department
P. 0. Box 1551.
Raleigh, NC 27602
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
J. D. Kloosterman, Director
Regulatory Compliance
H. B. Robinson Steam
Electric Plant
P. 0. Box 790
Hartsville, SC 29550
bc -w/enc:
Ytrocument Control Desk
H. Christensen, RuI
R. Lo, NRR
B. K. Grimes,
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
RII:DRS
RII:DRS
RII:DRP -
RII:EICS
CJu
- er
AGibson
EMerschoff
GJenkins
09//0/91
09/
/91
09/
/91
09/ /91