APPENDIX B NOTICE OF DEVIATION Carolina Power and Light Company Docket No. 50-261 H. B. Robinson 2 License No. DPR-23 Based on the NRC inspection conducted on January 5-9,

1981, certain of your activities appear to deviate from your commitments to the Commission as indi cated below:

CP&L Letter GD-79-3306. dated December 31, 1979 "Lessons Learned Short Term Requirements" coiMitted to comolete implementation of Requi rement 2.1.3.b as clarified in Enclosure 1 of NRFR Letter dated October 30, 1979 "Discussion of Lessons Learned Short Ter-Requirements was mad

-b installi of a highly reliable, redundant channel core subcooling monitorwhich provides a continuous onl idication of primary coolnt saturatioLn condition.T clarification had required at least a highly reliable single channel utilizing temperature input from each hot leg or the use of multiple core exit thermo couples.

Contrary to the above, as of January 7, 1981, the core subcooling monitor was no longer installed as committed in that the single channel which was energized utilized temperature input from only one hot leg and one core exit thermocouple.